Protocols and data

Pricing a BACnet integration with an existing building controller

Scope a read-only energy monitoring quote for a Tridium JACE 8000, Siemens PXC4 or Schneider AS-P by checking which measurements the controller already shares.

A building operator wants electricity use from twelve meters already visible on the building management system. Before pricing twelve new meter connections, ask the controls contractor to show how a collector can read one of those meters through the existing controller. A meter on a graphics screen establishes that the operator can see it. The quote depends on whether the controller shares that same measurement with an external client.

Find one exported meter reading

  • Contemporary Controls BAScontrol20. For a working panel, record one input channel, its assigned BACnet object and its configured unit. For replacement work, distinguish the BASC-20R relay loads from the BASC-20T triac loads. Both original models are discontinued.
  • BAScontrol22 and 22C. Ask whether the requested reading is a local controller point or comes from another BACnet device through the client function on a 22C.
  • BAScontrol22D and 22S. For the 22S, trace a serial instrument to its exported application value. For the 22D, include the existing router when collecting from a serial trunk.
  • WAGO PFC200 BACnet/IP. Record the full 750-8212/000-100 order code and ask for the exported point schedule. For a tender, match the installed version against BTL listing 31092. The measurements available to a collector depend on what the PLC application exposes.
  • Honeywell CIPer Model 50. For an installed station, request its exposed BACnet objects and one matching Niagara reading. For an expansion, list the existing Panel Bus I/O separately from new network devices. Honeywell specifies different upgrades for Panel Bus points and for network device and point capacity.
  • Tridium JACE 8000. In the Niagara station, identify the meter point and its BACnet server export. Record both identities. If the station must integrate more meters, request its Resource Manager summary and licence limits for both devices and points. For example, a site using all five device slots on an NC-8005 needs a capacity review before adding a sixth meter, even with unused points. Price the work to collect existing exports separately from adding field devices.
  • Siemens Desigo PXC4.E16-2. In Object view, find the measured input or value under Application or Field bus. Use its project-assigned object identifier and engineering unit for the comparison. If the monitoring scope includes downstream Modbus meters, confirm the full E16-2 order code. The E16S-2 has different integration capacity.
  • Siemens Desigo PXC4.E16.A. For a current-loop transmitter, check which of the four current-capable terminals the installer used before asking for its BACnet object.
  • Siemens Desigo PXC7.E400.A and PXC7.E400-N.A. Ask for the TX-I/O schedule and field meter list separately. The -N.A station needs wired access for commissioning.
  • Siemens Desigo PXC5.E24.A and PXC5.E24-N.A. Both variants can expose commissioned measurements over BACnet/IP. The -N.A version omits WLAN. Ask the site team to identify the Ethernet connection and share the commissioned point list before costing the integration.
  • Schneider SpaceLogic AS-P-NLS. In WorkStation, look under the BACnet Interface's Application folder for the object shared with external clients. Check which source meter point feeds it. An existing export can be scoped from that point list. If the project needs a new AS-P-NLS panel, include its terminal base in the hardware schedule and ask the operator to confirm the EBO 7.0 system licence at the top-level server.

With the site operator, read the agreed object's Present_Value over the approved network route. Compare the result with the controller and meter at the same time. Record the unit and update interval. A power reading in kW answers a different question from a cumulative energy reading in kWh, even when both carry the same meter name.

For a LOYTEC LINX-202 or LINX-203, ask for the Device instance that owns the reading. A LINX-203 can route to a downstream meter as well as publish a mapped copy of the same measurement.

For a Daikin Applied MicroTech III chiller on MS/TP, ask for the communications module label and the BACnet router serving its trunk. The point table gives separate inputs for measured entering and leaving evaporator water temperatures.

Check network engine capacity

If a project includes new field devices, request the installed SNE order code and an inventory by network. Johnson Controls publishes separate trunk and engine limits at Release 11.0.

  • SNE1050. Count devices across all integrations when pricing an NAE35 replacement.
  • SNE1100. Identify third-party devices before using the 100-device serial figure.
  • SNE110L. Check the ADS-Lite-A parent server and ten-device BACnet/IP limit on the L variant.
  • SNE2200. Count the two field buses separately and identify which bus supplies each reading.

Match the field controller to the measurement

For a small Metasys panel, the 04060 models have three universal inputs. The 09090 models have seven, and the H versions add a local display. Ask for the installed CGM or CGE code before pricing the connection. CGM uses the serial field network for BACnet. CGE can use BACnet/IP on Ethernet.

For a VAV box, the 03050 models have an integrated pressure transducer and actuator. Specify the P variant when the project needs the built-in position feedback potentiometer, then confirm that the point list exposes its measurement.

Price lighting areas and hub licences

For a Lutron Vive Premium hub, BACnet is included. Ask for a list of areas on each hub and check a lighting power reading from one area before multiplying the configuration cost across the floor. For Vive Starter and Standard hubs, check the HJS-UPDATE licence first. If a Starter expansion will exceed 75 wireless devices, price its capacity upgrade separately.

For LOYTEC L-DALI lighting controllers, ask for the channel and group schedule. Mark which areas have estimated energy from the lighting controller and which have a separate electrical meter before quoting a measured consumption report.

For the Honeywell 301-C-DLC-BIP, include the detector tags, gases and units in the enquiry so the engineer can scope monitoring for each location. For a Vertiv Liebert IntelliSlot IS-UNITY-DP, include the host equipment model and controller revision. They determine which object table applies to the card.

Separate collection from controls engineering

Suppose the collection trial succeeds and the contractor finds existing energy objects for nine of the twelve meters. Ask for collection of nine existing objects as one line in the quote. Ask the controls contractor to investigate the other three separately. The remaining work depends on whether each meter already has a station point, needs a new export, or still needs a field connection.

For a project enquiry, include the site count, controller models and software versions, meters per controller, required units, collection interval and who owns commissioning. A short point list with one checked example gives the estimator enough detail to distinguish repeat configuration from site-specific work.