WAGO identifies 750-8212/000-100 as the second-generation PFC200 with two Ethernet ports, RS-232/-485 and BACnet/IP. The product is programmed with CODESYS V3.5 from firmware release 23, while WAGO's 2026 release notes list this exact order code and BACnet revision 26 support in the current firmware line. These sources establish product identity and controller capability, but do not publish the commissioned BACnet server object schedule, object access rules, application version or a direct Edge pairing. Monitoring remains unverified and all PLC, I/O, setpoint and output writes are excluded.
- BACnet/IP
- RS-485
Building automation controller
Compatibility
Direct Edge integration not yet verified
WAGO publishes the exact BACnet/IP order code and current BACnet firmware support. The retained public sources do not define the commissioned application's BACnet device instance, object identifiers, read permissions, quality behavior or polling limits, and do not prove an installed Edge client path.
750-8212/000-100 only. Record the order code, hardware revision, firmware, CODESYS project, application checksum and BACnet configuration. Obtain the exported BACnet object schedule and matching PICS or application documentation from the controls owner. Use only an approved read-only object allowlist. Do not write PLC variables, commandable BACnet objects, priorities, schedules, parameters, I/O or equipment outputs.
Models
| Models | Interface | Route into Edge |
|---|---|---|
| 750-8212/000-100 | PFC200 second generation with two configurable Ethernet ports, integrated switch, RS-232/-485 and the BACnet/IP product variant. | Hold a direct route until firmware, application identity, BACnet device and object export, permissions and Edge client support are proven. |
| 750-8212 without /000-100 | PFC200 second-generation controller with two Ethernet ports and serial interface, but the base order code does not establish the BACnet/IP variant. | Do not infer BACnet/IP from the shared 750-8212 stem. Confirm the full order code. |
| Other PFC100, PFC200 and PFC300 variants | Separate controllers with different Ethernet, serial, CAN, cellular, temperature and runtime combinations. | Use the exact WAGO order code and its own current firmware documentation. |
Specifications
The product page states CODESYS V3.5 programming from firmware release 23 and e!COCKPIT support through release 22. Firmware and project identity therefore belong in every integration record.1
- Network interfaces
- Two configurable Ethernet ports with integrated switch1
- Serial interface
- RS-232/-485; its project role is not established by the BACnet/IP product name1
- Engineering runtime
- CODESYS V3.5 from firmware release 23; e!COCKPIT up to release 221
- Current BACnet evidence
- The April 2026 firmware line lists 750-8212/000-100 and BACnet revision 26 support2
Interface
Documented measurements and integration boundaries for PFC200 BACnet/IP.
- Potential temperatures, pressures, flows, energy readings, equipment states and application values depend entirely on the commissioned IEC 61131 and BACnet application.
- Retain device and object identifiers, type, unit, source I/O or field device, update behavior, reliability or status and commandability for every approved observation.
- Keep physical I/O, serial field-device data, PLC variables and derived BACnet values distinct so a reader can trace each value to its source.
- Commandable objects, priority-array writes, schedules, PLC variables, parameters, application logic, I/O and equipment outputs remain outside this guide.
Assessment
Exact 750-8212/000-100 after hardware, firmware, CODESYS project, application checksum, BACnet export and Edge client support are confirmed; no released path or control.
- InteroperabilityLimited
- WAGO publishes the exact BACnet/IP variant and current BACnet firmware support, but the project-specific device, object and access contract remains absent.12
- AccuracyNot yet assessed
- The modular I/O and PLC application can expose many value types, but source accuracy, unit, scale and quality depend on the installed module, field device and application mapping.1
- SecurityNot yet assessed
- The retained public sources do not establish an authenticated or encrypted BACnet client path, application permissions or the site's network policy.12
- ReliabilityNot yet assessed
- Current firmware maintenance is visible, but polling limits, object-update timing, stale-value behavior and restart semantics for an external client are not published here.2
- RuggednessNot yet assessed
- The product page identifies industrial and building-automation use, but this retained evidence set does not record the complete environmental and enclosure ratings.1
- ScalabilityNot yet assessed
- The controller accepts modular WAGO I/O, but the public evidence here does not define an external BACnet object count, polling budget or concurrent-client limit for the commissioned application.1
Setup
-
Confirm the complete WAGO identity
Record 750-8212/000-100, hardware revision, serial number, firmware release, runtime, CODESYS project version and application checksum. The base 750-8212 order code is not equivalent evidence for the BACnet/IP variant.
-
Obtain the application object contract
Request the project's PICS and BACnet export from the controls owner. Retain device and object identifiers, types, units, source I/O or field device, update behavior, quality and commandability.
-
Approve a read-only network path
Use the approved controls VLAN and an explicit non-commandable object allowlist. Confirm the installed Edge build's BACnet/IP client separately. Do not expose the PLC web or engineering interfaces to the public internet.
-
Compare a bounded point set
Compare selected objects with the CODESYS or BMS view and the original sensor, meter or field device. Test stale data, PLC restart and communications loss without changing the controller application or outputs.
Common questions
- Is every PFC200 750-8212 a BACnet/IP controller?
- No. WAGO identifies the BACnet/IP variant by the complete order code 750-8212/000-100. The shared 750-8212 stem covers related controller hardware and does not prove the installed BACnet product variant.12
- Does BACnet revision 26 support provide a ready point list?
- No. It describes firmware capability. The CODESYS application and BACnet configuration determine the device instance, object identifiers, values, units, access and quality behavior for a particular project.12
- Can Edge write PLC variables or BACnet setpoints through this guide?
- No. This guide releases no commandable object, priority-array write, schedule change, PLC variable, parameter, application-logic change or physical output command.1
Sources
- PFC200 BACnet/IP controller 750-8212/000-100 product page (opens in a new tab)
- Controller PFC100/200 second generation and PFC300 release notes (opens in a new tab) (PDF)
Further reading
Product names and trademarks belong to their owners. Publication does not imply endorsement or a commercial relationship.