For an NAE55 replacement serving two field buses, request a separate device inventory for each bus. At Release 11.0 a trunk with third-party devices has a limit of 64. A lightly loaded second trunk does not increase capacity on the first.

Johnson Controls Metasys SNE22001 network engine with status indicators and field bus terminals
  • BACnet/IP

Building automation controller

Ask an engineer

Compatibility

Compatible with Edge over BACnet/IP

The SNE exposes BACnet objects on the building network. Edge can collect measurements that the controls contractor has made available on the engine.

Obtain one accessible object and its source from the commissioned Metasys point list.

Connect it with

For points exposed by the commissioned SNE

  • BACnet
  • Edge
  • Platforms
Building automation controller
Interface
Gateway
Edge
Output
SNE2200SNE2200 BACnet objects
Protected EthernetSegmented LAN
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeBACnet/IP client + object map
Customer platformMQTT · API · files
BACnet/IP
Protected Ethernet
Runs locally
Optional onward data
Record the Device instance of the engine and the type and instance of the object supplied to Edge. Include the source field controller or meter in the handover. The customer-platform output is optional; Edge remains the local system of record.

Models

Download
ModelsInterfaceRoute into Edge
M4-SNE22000-0 and M4-SNE22001-0BACnet/IP on Ethernet with two MS/TP field buses.Johnson Controls identifies M4-SNE22001-0 as the Release 11.0 replacement for M4-SNE22000-0. BTL listing 30658-1 covers both order codes at firmware 11.0.0.1516.

Specifications

The following limits apply to Metasys Release 11.0. Count existing devices and planned additions before allocating capacity.1

Predecessor family
NAE551
BACnet/IP devices per trunk
2001
MS/TP trunks
21
MS/TP devices per trunk with third-party devices
641
Devices across all integrations
6001

Interface

Documented measurements and integration boundaries for SNE2200.

  • Ask for the object identifier and Units of the energy or power reading already displayed in Metasys. Point instances are assigned in the site project.
  • If the contractor supplies an object on the field device itself, record that device’s identity and routed network separately from objects hosted by the SNE.

Assessment

SNE2200 serving project-defined BACnet objects.

InteroperabilityWell supported
The BTL listing includes BACnet/IP and the two named hardware variants.3
AccuracyNot yet assessed
Measurement accuracy depends on the instrument behind the object.2
SecurityNot yet assessed
The site owner controls access to the engine and the building network.1
ReliabilityNot yet assessed
The listing records tested protocol capabilities.3
RuggednessNot yet assessed
Confirm the environment of the installed control panel.1
ScalabilitySupported with conditions
Release 11.0 allows 600 devices across integrations, subject to individual trunk limits.1
LifecycleSupported with conditions
The model table identifies the replacement order code for the earlier hardware.1

Setup

  1. Identify the installed order code, software release, engine Device instance and meter tag.

  2. Read Present_Value and Units on one exported analog measurement.

    Compare its value and timestamp with the same reading in Metasys. Check that a power value in kW has not been labelled as energy in kWh.

  3. Count the two field buses separately and identify which bus supplies each reading.