LOYTEC LINX-202 / LINX-203
Building automation controller
A LINX-202 can publish mapped measurements over BACnet/IP. A LINX-203 can also route traffic to a serial BACnet trunk. Ask whether the required meter reading belongs to the server application or to a field device behind the router before pricing engineering time.
Compatibility
Compatible with Edge over BACnet/IP
Edge reads commissioned objects from the controller on BACnet/IP. A controller operating on MS/TP needs an IP route.
Check the configured network mode and obtain the object schedule. For a BACnet/SC installation, identify a site-provided BACnet/IP route for collection.
Connect it with
For a commissioned BACnet/IP interface
- BACnet
- Edge
- Platforms
For a controller on a serial trunk
- BACnet
- Edge
- Platforms
Models
| Models | Interface | Route into Edge |
|---|---|---|
| LINX-202 | Selects BACnet/IP, BACnet/SC or MS/TP. | For collection on the Ethernet network, request the objects published by the server in BACnet/IP mode. |
| LINX-203 | Built-in router between BACnet/IP, BACnet/SC and MS/TP. | For a routed read, record the field device instance as well as the downstream network number. |
Interface
Documented measurements and integration boundaries for LINX-202 / LINX-203.
- The datasheet allows 750 BACnet objects and 750 BACnet client mappings. The project point export identifies which mapped measurements the server exposes.
- When reading a meter through the LINX-203 router, use the meter Device instance. When reading a value mapped into the automation server, use the LINX Device instance and its assigned object.
Assessment
LINX-202 and LINX-203 over BACnet/IP or routed MS/TP.
- InteroperabilityWell supported
- Listing 31461 covers this controller family at firmware 8.6.2
- AccuracySupported with conditions
- The datasheet allows 750 BACnet objects and 750 BACnet client mappings. The project point export identifies which mapped measurements the server exposes.1
- SecurityNot yet assessed
- The site network mode and access arrangements depend on the installation.1
- ReliabilityNot yet assessed
- The BTL listing documents protocol conformance.2
- RuggednessNot yet assessed
- Confirm installation conditions for the controller enclosure.1
- ScalabilitySupported with conditions
- The datasheet specifies object and client mapping limits separately.1
- LifecycleNot yet assessed
- The datasheet identifies the individual order codes.1
Setup
-
Ask the controls engineer for the meter identifier, Device instance, object type, instance number and units.
-
Read Present_Value and Units for one mapped meter measurement and compare it with the meter display at the same timestamp.
-
Keep the source meter identifier alongside the LINX object so the same load is counted once if both routes are visible.
Sources
- L-INX automation servers LINX-202 and LINX-203 (opens in a new tab)
- BTL listing 31461 for LOYTEC building controllers (opens in a new tab) (PDF)
Further reading
Product names and trademarks belong to their owners. Publication does not imply endorsement or a commercial relationship.






