Trane Tracer UC800

Building automation controller

For a CenTraVac chiller with AdaptiView, identify the UC800 controller and the chiller build shown in the service tool. The evaporator status screen distinguishes entering water, leaving water and the active chilled-water setpoint. Specify which of those readings the plant report needs.

Trane UC800 chiller controller with its communications terminals and service port
  • BACnet MS/TP

Building automation controller

Ask an engineer

Compatibility

Compatible with Edge through routed BACnet MS/TP

UC800 supports BACnet MS/TP through a site router.

Use the object list from the commissioned equipment and its installed application.

Connect it with

For a UC800 on the MS/TP network

  • BACnet
  • Edge
  • Platforms
Building automation controller
Interface
Gateway
Edge
Output
Tracer UC800UC800
BACnet routerRoutes the field segment to the building IP network.
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeBACnet/IP client + object map
Customer platformMQTT · API · files
BACnet MS/TP
BACnet/IP
Runs locally
Optional onward data
Record the Device instance and routed serial network number alongside the equipment tag. The customer-platform output is optional; Edge remains the local system of record.

Models

Download
ModelsInterfaceRoute into Edge
Tracer UC800BACnet MS/TP through a site router.Match the CenTraVac build and AdaptiView application to the site point schedule.

Interface

Documented measurements and integration boundaries for Tracer UC800.

  • Request the entering and leaving evaporator water temperatures. A temperature difference can describe cooling across the evaporator, but a cooling power calculation also needs synchronized water flow and fluid properties.

Assessment

Tracer UC800 on the documented building network.

InteroperabilityWell supported
Trane documents UC800 communication over the selected building network.1
AccuracyNot yet assessed
The installed equipment and the measurement source determine the meaning of the feedback.2
SecurityNot yet assessed
Consult the site controls owner for the permitted network route.1
ReliabilityNot yet assessed
Site operation depends on the installed controller and network.1
RuggednessNot yet assessed
Confirm the rating of the installed equipment enclosure.2
ScalabilitySupported with conditions
Group units by controller, network and loaded application before mapping points.1
LifecycleSupported with conditions
Retain the installed application and equipment identifiers with the point list.2

Setup

  1. Identify the equipment tag, controller application and commissioned Device instance.

  2. Match one leaving-water reading to the local evaporator status at the same time.

    If the local status shows no measurement, leave the acceptance check open until a current reading is available.

  3. Record the object type and instance, Present_Value, Units and the timestamp alongside the comparison.