Trane Tracer UC210

Building automation controller

For a floor of variable-air-volume boxes, request the box tag, inlet size and most recent balancing record for each terminal. The UC210 air-volume reading becomes much easier to check when the controls contractor can match it to the measured flow for that box.

Trane Tracer UC210 VAV controller configurations
  • BACnet MS/TP

Building automation controller

Ask an engineer

Compatibility

Compatible with Edge through routed BACnet MS/TP

UC210 supports BACnet MS/TP through a site router.

Use the object list from the commissioned equipment and its installed application.

Connect it with

For a UC210 on the MS/TP network

  • BACnet
  • Edge
  • Platforms
Building automation controller
Interface
Gateway
Edge
Output
Tracer UC210UC210
BACnet routerRoutes the field segment to the building IP network.
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeBACnet/IP client + object map
Customer platformMQTT · API · files
BACnet MS/TP
BACnet/IP
Runs locally
Optional onward data
Record the Device instance and routed serial network number alongside the equipment tag. The customer-platform output is optional; Edge remains the local system of record.

Models

Download
ModelsInterfaceRoute into Edge
Tracer UC210BACnet MS/TP through a site router.The BTL listing names UC210 at software 2.0.

Interface

Documented measurements and integration boundaries for Tracer UC210.

  • Ask for the actual terminal airflow and its unit. Keep minimum ventilation flow and maximum flow settings as separate quantities.

Assessment

Tracer UC210 on the documented building network.

InteroperabilityWell supported
Trane documents UC210 communication over the selected building network.3
AccuracyNot yet assessed
The installed equipment and the measurement source determine the meaning of the feedback.2
SecurityNot yet assessed
Consult the site controls owner for the permitted network route.1
ReliabilityNot yet assessed
Site operation depends on the installed controller and network.1
RuggednessNot yet assessed
Confirm the rating of the installed equipment enclosure.2
ScalabilitySupported with conditions
Group units by controller, network and loaded application before mapping points.1
LifecycleSupported with conditions
Retain the installed application and equipment identifiers with the point list.2

Setup

  1. Identify the equipment tag, controller application and commissioned Device instance.

  2. Compare actual airflow with a simultaneous balancing measurement or compare a saved trend against a time-matched balancing record.

    Check whether the instrument reports L/s or cfm.

  3. Record the object type and instance, Present_Value, Units and the timestamp alongside the comparison.