Contemporary Controls BASRT-B BASrouter
BACnet router
Specify the BASRT-B for ongoing readings from serial BACnet instruments when the switchboard has 35 mm DIN rail, a 24 V AC or DC supply and Ethernet to the collector. First check whether the controls installation already has a router serving that trunk. An existing reachable route can avoid adding panel hardware.
Compatibility
Compatible with Edge through routed BACnet/IP
Edge uses BACnet/IP on Ethernet. The BASRT-B routes the request to the instrument on its MS/TP network.
Match the network number and serial rate to the controls schedule, then compare a known meter object with the operator display.
Connect it with
For a permanent monitoring connection
- Wired
- Edge
- Platforms
Models
| Models | Interface | Route into Edge |
|---|---|---|
| BASRT-B | Ethernet and EIA-485 for BACnet MS/TP | Connect an existing BACnet MS/TP meter trunk to the Gateway through a panel-mounted Ethernet router with a 24 V supply. For a tender requiring independent BACnet testing, match the installed software to BTL listing 30266. It covers the BASRT-B at 3.0.3, tested in January 2018. |
Interface
Documented measurements and integration boundaries for BASRT-B BASrouter.
- Use a measurement from the field meter’s own object list. The router transports that reading; the instrument determines its units and accuracy.
Assessment
BACnet routing between Ethernet and an existing serial meter trunk.
- AccuracyNot applicable
- The field instrument determines measurement accuracy.1
- SecurityNot yet assessed
- Site access controls require project-specific review.
- ReliabilitySupported with conditions
- Check panel power capacity against 2 W at 24 V DC or 4 VA at 24 V AC.1
- RuggednessSupported with conditions
- IP30 enclosure rated for operation from −40 to 75 °C.1
- ScalabilitySupported with conditions
- Size the trunk for the installed serial rate and polling interval. The supported rates range from 9.6 to 76.8 kbit/s.1
- LifecycleSupported with conditions
- The order code and datasheet revision identify the router for the commissioning record.1
Setup
-
Obtain the approved network numbers, serial rate and a known field device instance from the operator.
-
Read Present_Value and Units on a documented field object from the Ethernet side.
Compare both with the operator display for the same circuit.
-
Include the panel location, 24 V supply and field point schedule in the handover.
Sources
- BASRT-B BASrouter datasheet, DS-BASRTB00-AD5 (opens in a new tab) (PDF)
- Successful BASrouter installation and operation (opens in a new tab) (PDF)
- BTL product listing 30266 for BASRT-B software 3.0.3 (opens in a new tab) (PDF)
Further reading
- GuideConnecting existing power meters to BACnet
- GuideBACnet routing and foreign devices
- GuideGateway for BACnet/IP monitoring
- GuideBASRTP-B BASrouter
- GuideCrompton Integra 1630 meter options
- ManufacturerContemporary Controls devices
- ProtocolBACnet/IP building controllers
- CategoryBuilding and energy integration controllers
Product names and trademarks belong to their owners. Publication does not imply endorsement or a commercial relationship.