Distech Controls ECB-103

Building automation controller

Start with the room schedule for the two-pipe fan coil or chilled ceiling. The ECB-103 has four universal inputs. Ask which one carries the required temperature or whether a communicating room sensor provides it. This distinction determines whether the quote needs a new probe.

Distech ECB-103 controller with its exposed terminal strip
  • BACnet MS/TP

Building automation controller

Ask an engineer

Compatibility

Compatible with Edge through routed BACnet MS/TP

The ECB-103 serves BACnet objects over MS/TP. Edge reaches the field network through a BACnet router.

Request the assigned Device instance, router network number and the commissioned object list for this controller.

Connect it with

For a controller on the building MS/TP field network

  • BACnet
  • Edge
  • Platforms
Building automation controller
Interface
Gateway
Edge
Output
ECB-103ECB-103
BACnet routerRoutes the field segment to the building IP network.
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeBACnet/IP client + object map
Customer platformMQTT · API · files
BACnet MS/TP
BACnet/IP
Runs locally
Optional onward data
Record the network number for the serial segment and the object identifier assigned to the required feedback. The customer-platform output is optional; Edge remains the local system of record.

Models

Download
ModelsInterfaceRoute into Edge
ECB-1034 universal inputs, 4 TRIAC outputs and 2 universal outputs.BTL listing 31024 names this model at application version 2.17.20287.2 on MS/TP.

Interface

Documented measurements and integration boundaries for ECB-103.

  • Identify the source sensor and programmed engineering range behind each input. A spare physical input can provide a new measurement only when a suitable sensor is connected and configured.
  • Request the object type, instance, unit and update interval for each measurement in the project.

Assessment

ECB-103 on a routed BACnet field network.

InteroperabilityWell supported
The BTL listing identifies the controller model and tested MS/TP implementation.2
AccuracyNot yet assessed
Match the measurement source to the application and compare the exported engineering units.1
SecurityNot yet assessed
Access to the building network depends on the site configuration.2
ReliabilityNot yet assessed
The listing covers tested protocol behaviour.2
RuggednessNot yet assessed
Identify the enclosure and location before specifying replacement equipment.1
ScalabilitySupported with conditions
Count the required inputs and outputs against the published hardware configuration.1
LifecycleSupported with conditions
Record the installed application version with the model and its point schedule.2

Setup

  1. Identify the terminal or plant tag and the MS/TP segment that serves it.

  2. For a room-temperature trend, match the room sensor or input channel to its analog object.

    Compare the reading with a reference in the same room and record the temperature unit.

  3. Read Present_Value and Units from the selected analog object and retain the reference reading, equipment tag and timestamp together.