ONICON System-10

Thermal energy meter

On an existing System-10, photograph the full SYS-10-ABCD-EFGG label and locate the communications board. Position C identifies the interface: 1 is BACnet MS/TP, 3 is BACnet/IP and 0 means the meter was supplied without serial communications. Position B identifies the supply and GG the temperature sensor option. These details matter when two visually similar calculators serve different water circuits.

ONICON System-10. System-10 BTU meter enclosure with LCD and three front buttons.
  • BACnet/IP
  • BACnet MS/TP

Thermal energy meter

Ask an engineer

Compatibility

Compatible with Edge over BACnet/IP or routed BACnet MS/TP

The System-10-BAC interface guide documents distinct Ethernet and RS-485 boards and lists the measurement objects. Edge reads these objects using its BACnet/IP client.

Match the installed interface to guide 0652-12. Record the Device instance, displayed flow unit and one reading from the same circuit.

Connect it with

Route into Edge

For a System-10 with communications code 3

  • BACnet
  • Edge
  • Platforms
Thermal energy meter
Interface
Gateway
Edge
Output
System-10System-10 BACnet/IP board
Protected EthernetSegmented LAN
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeBACnet/IP client + object map
Customer platformMQTT · API · files
BACnet/IP
Protected Ethernet
Runs locally
Optional onward data
Guide 0652-12 identifies a 10Base-T RJ45 port on its Ethernet board. Confirm the site switch supports that link and obtain the commissioned IP settings. The customer-platform output is optional; Edge remains the local system of record.

For communications code 1 on a shared MS/TP trunk

  • BACnet
  • Edge
  • Platforms
Thermal energy meter
Interface
Gateway
Edge
Output
System-10System-10 serial board
BACnet routerRoutes requests from Ethernet to the meter’s RS-485 segment.
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeBACnet/IP client + object map
Customer platformMQTT · API · files
BACnet MS/TP
BACnet/IP
Runs locally
Optional onward data
Record the serial network number and the router serving the meter. A collection quote can use the existing route where the building operator confirms access. The customer-platform output is optional; Edge remains the local system of record.

Models

Download
ModelsInterfaceRoute into Edge
SYS-10-ABCD-EFGGCommunications code 1 selects RS-485 BACnet MS/TP; code 3 selects BACnet/IP. Code 5 denotes the separate DualNet option.For a DualNet installation request the fitted interface documentation and site network schedule before selecting a route.

Interface

Documented measurements and integration boundaries for System-10.

  • Analog Input 2 is volume flow. Its configured units may be US gallons per minute, litres per second or cubic metres per hour, among others. Use the object’s Units property.
  • Analog Input 1 reports energy rate. Inputs 3 and 4 report the supply and return temperatures. Keep the measured rate separate from cumulative consumption in the reporting schedule.

Assessment

System-10 meters with the BACnet board documented in guide 0652-12.

InteroperabilityWell supported
The interface guide identifies two BACnet transports and gives the flow and temperature object identifiers.2
AccuracySupported with conditions
Record the temperature sensor range and source flow meter when assessing the branch measurement.1
SecurityNot yet assessed
Access to the collector network depends on the installed controls design.2
ReliabilitySupported with conditions
Check the input supply option on the label and compare the displayed flow with the network reading.1
RuggednessSupported with conditions
The model code distinguishes NEMA 13 and NEMA 4 enclosures. Record the installed enclosure for a replacement quote.1
ScalabilitySupported with conditions
Serial installations need a trunk and router inventory. Ethernet boards need an appropriate switch connection per meter.2
LifecycleSupported with conditions
Keep the complete order code with the flow and temperature sensor details when replacing a calculator.1

Setup

  1. Identify the branch served by the flow sensor and record the complete calculator code and network settings from the operator.

  2. Using section 2.4 of guide 0652-12, read Present_Value and Units on Analog Input 2.

    Compare with the flow display at the same time, using the same units.

  3. Read supply and return temperatures on the same Device instance.

    Confirm these correspond to the two sensors on the surveyed loop before collecting a plant trend.