Leviton VerifEye 7000 and 7100
Multichannel energy meter
Start the quote with the panel schedule. List the number of phases on each monitored feeder and the current transformers already installed. A 12-channel meter has inputs for four three-phase loads. Counting twelve feeder names without their phase counts can undersize the meter.
Compatibility
Compatible with Edge over BACnet/IP or routed BACnet MS/TP
The meters serve BACnet/IP over Ethernet and BACnet MS/TP over RS-485. Edge can use the commissioned IP connection or a router serving the serial trunk.
Match the installed meter and configured elements to the Leviton master register list. Record the feeder name associated with each element.
Connect it with
For a meter commissioned for BACnet/IP
- Wired
- Edge
- Platforms
For a meter commissioned for BACnet MS/TP
- BACnet
- Edge
- Platforms
Models
| Models | Interface | Route into Edge |
|---|---|---|
| 70D12 and 71D12 | Each has a display and 12 current inputs. The 70D12 uses a mounting plate and the 71D12 includes an enclosure. | For four three-phase feeders, record the CT types, enclosure provision and Ethernet or routed serial connection. |
| 70D24 and 71D24 | Each supports eight three-phase elements and has two reference voltage inputs. | Group feeders by voltage reference as well as by phase count. Include the exact model and panel arrangement in the quote. |
Interface
Documented measurements and integration boundaries for VerifEye 7000 and 7100.
- The master list gives total active power for Element A at Analog Input 1167 and Element B at Analog Input 11167, both in kW. Each reading sums the phases assigned to that element.
- Record accumulated energy in kWh as a separate channel when the project requires consumption over a reporting interval.
Assessment
Read-only feeder monitoring on the 7000 and 7100 series.
- InteroperabilityWell supported
- The manufacturer identifies BACnet objects by element and documents both Ethernet and serial connections.2
- AccuracySupported with conditions
- Choose the number of CT inputs from the feeder phase counts and voltage references.3
- SecurityNot yet assessed
- Confirm the allowed collection route with the controls operator.1
- ReliabilitySupported with conditions
- Compare each element with the matching local power reading during the same load condition.1
- RuggednessSupported with conditions
- The manual lists an operating range of −20 to 60 °C. Check the fitted enclosure and panel environment.1
- ScalabilitySupported with conditions
- The 48-channel 70D48 and 71D48 support sixteen three-phase elements. Check the number of inputs consumed by each feeder.3
- LifecycleSupported with conditions
- Record the exact catalog number, mounting arrangement and element-to-feeder mapping for replacement.3
Setup
-
Ask the operator for the panel schedule, element labels, CT ratios and voltage-reference assignments.
Select two known feeders with distinguishable loads.
-
On a meter with Elements A and B commissioned, read Present_Value for AI 1167 and AI 11167.
Compare each kW value with its own element in Power Meter Viewer during the same interval.
-
Retain the Device instance, element letter, object instance, feeder label and unit.
Resolve a sign or magnitude discrepancy against the existing CT and phase assignments before accepting the trend.
Sources
- VerifEye advanced multi-circuit meter user guide, PK-A3259-10-00-0F-W (opens in a new tab) (PDF)
- Leviton master register list, BACnet object columns on sheets A and B (opens in a new tab)
- Series 7000 and 7100 model selection table (opens in a new tab) (PDF)