Deye MC-L430-2H2

Commercial battery energy storage system

The MC-L430-2H2 and MC-L430-2H3 are 200 kW AC battery cabinets with 430.08 kWh of 280 Ah LiFePO4 cells and two SUN-100K-PCS01HP3 power conversion modules. Deye lists RS485, Modbus TCP and DIDO, and its brochure draws the MS-EMS linked to the cabinets over those interfaces. Edge reads the cabinet over Modbus TCP with the project point list from Deye, or measures its 400 V AC feeder with an EpiSensor ZEM.

Deye MC-L430-2H2
  • Modbus TCP
  • RS485

Commercial battery energy storage system

Ask an engineer

Compatibility

Compatible with EpiSensor Edge over Modbus TCP, or through an EpiSensor ZEM on the AC feeder

The MC-L430-2H2 and 2H3 manuals list RS485, Modbus TCP and DIDO as the cabinet’s communication interfaces, and Deye’s brochure shows the MS-EMS connected to the storage cabinets over RS485, Modbus TCP and DIDO. Edge is a Modbus TCP client and reads the cabinet with the addresses, data types and units in the project point list from Deye. Edge also measures the cabinet through an EpiSensor ZEM with Rogowski coils on its 380/400 V AC connection: charge and discharge power and energy at the battery’s AC boundary.

MC-L430-2H2 (manual Issue 06, 2026-08-27) and MC-L430-2H3 (manual Issue 07, 2026-07-15) AC cabinets, with up to three MC-L430-BC-2 battery cabinets. Site check: obtain the Modbus TCP endpoint and point list for the installed cabinet and MS-EMS from Deye, and record the nameplate, firmware and battery cabinet count. Read only; dispatch stays with the MS-EMS or the site controller.

Connect it with

Route into Edge

When Deye supplies the Modbus TCP endpoint and point list for the installed cabinet or its MS-EMS

  • Modbus
  • Edge
  • Platforms
Commercial battery energy storage system
Interface
Gateway
Edge
Output
MC-L430-2H2MC-L430-2H2 or MC-L430-2H3 cabinet
Protected EthernetSegmented LAN
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeModbus client + register map
Customer platformMQTT · API · files
Modbus TCP
Protected Ethernet
Runs locally
Optional onward data
Give the Gateway an address on the protected site network and configure the reads from the project point list: identity, operating state, AC power, state of charge and alarms first. Deye’s diagrams connect the MS-EMS to the cabinets over RS485, Modbus TCP and DIDO, so agree with Deye which device serves the monitoring client and whether a second client may poll alongside the EMS. Read only. The customer-platform output is optional; Edge remains the local system of record.

On any MC-L430 site, for charge and discharge power and energy at the cabinet’s 380/400 V AC connection

  • Wired
  • Edge
  • Platforms
Commercial battery energy storage system
Interface
Gateway
Edge
Output
MC-L430-2H2MC-L430-2H2 AC power distribution unit, grid input
EpiSensor ZEMMeasures the cabinet’s AC feeder with its own Rogowski coils and reports over the EpiSensor wireless network
ZGW-20 GatewayHosts Edge locally
EpiSensor EdgeProtocol client + point model
Customer platformMQTT · API · files
Rogowski coils on the 380/400 V AC feeder
EpiSensor wireless
Runs locally
Optional onward data
A qualified electrician fits the ZEM’s Rogowski coils on the three phases of the feeder between the cabinet’s AC power distribution unit and the site switchboard, with the voltage reference taken from the same circuit. The ZEM reports over the EpiSensor wireless network, so no Deye network, EMS or PCS setting changes. The customer-platform output is optional; Edge remains the local system of record.

Models

Download
ModelsInterfaceRoute into Edge
MC-L430-2H2AC cabinet: 200 kW rated, 220 kW maximum, 430.08 kWh, 280 Ah LiFePO4 at 768 V DC nominal; two SUN-100K-PCS01HP3 modules; IP54, C4 or betterRead over Modbus TCP with Deye’s project point list, or measure the cabinet’s AC feeder with an EpiSensor ZEM.
MC-L430-2H3Same power, energy and DC ratings; IP55 battery compartment and chiller control box, IP65 PCS; C4M (C5M optional); noise 75 dBA or less at 1 mUse the 2H3 manual for enclosure and noise limits, and the point list Deye issues for that cabinet.
MC-L430-BC-2DC battery cabinet without a PCS; up to three in parallel with one AC cabinetIts energy reaches the grid through the AC cabinet’s PCS, so the AC cabinet’s feeder carries it. Take battery-cabinet values from the point list Deye issues for the system.
MC-LC430-2H2 and MC-LC480-2H2PV, battery and EV charging cabinets with their own manuals, cells and ratingsTreat each as a separate product; do not reuse the MC-L430-2H2 ratings.

Specifications

Each MC-L430 AC cabinet holds ten battery packs, a DC power distribution unit, two SUN-100K-PCS01HP3 PCS modules, an AC power distribution unit, a liquid-cooling system and heat, smoke and gas detectors with thermal aerosol devices and a water inlet for fire suppression.23

Power
200 kW rated; 220 kW maximum (1.1 times rated); power factor -1 to +124
Energy
430.08 kWh nominal; 280 Ah LiFePO4; 0.5P charge and discharge rate24
DC voltage
768 V DC nominal; 648 to 876 V DC (2.7 to 3.65 V per cell, 240 cells in series)2
AC connection
380/400 V, 3L + N + PE, 50/60 Hz2
PCS modules
Two SUN-100K-PCS01HP3: 100 kW and 110 kVA each, 166.7/159.5 A maximum AC current, IP65; interfaces WIFI, RS485, CAN and meter24
Communication
RS485, Modbus TCP, DIDO123
Enclosure and environment
2H2: IP54, C4 or better. 2H3: IP55 battery compartment, IP65 PCS, C4M. Both -25 to +55 °C operating, up to 2000 m23
Size and weight
2000 × 1300 × 2480 mm; 5000 kg or less23

Interface

Documented measurements and integration boundaries for MC-L430-2H2.

  • Deye does not publish the cabinet’s Modbus TCP point list in the manuals or brochure; the project point list from Deye supplies addresses, function codes, data types, scale factors, word order and power sign.
  • From that list, start with identity, operating state, AC active power, state of charge and alarm words, and keep each PCS module, the battery cabinets, the MS-EMS and the site meter as separate sources with their own timestamps.
  • Through an EpiSensor ZEM on the AC feeder, Edge records voltage, current and active power per phase and import and export energy at the cabinet’s AC connection.
  • Fire alarm and system emergency fault dry contacts stay with the life-safety system. No charge, discharge, export-limit or grid-service command is in scope of this guide; any control needs the site owner’s and Deye’s agreement.

Assessment

MC-L430-2H2 (manual Issue 06) and MC-L430-2H3 (manual Issue 07) AC cabinets with up to three MC-L430-BC-2 battery cabinets. Read-only monitoring; no dispatch or grid-service claim.

InteroperabilityLimited
Deye lists Modbus TCP, RS485 and DIDO and draws them between the MS-EMS and the cabinets. The point list is not public, so each project needs Deye’s document before Edge can read the cabinet.24
AccuracyNot yet assessed
The retained documents give ratings but no readable point set with units, resolution, sign or update rate.
SecurityNot yet assessed
The manuals do not describe authentication, roles or network hardening for the local Modbus TCP interface, so keep it on a protected site network.2
ReliabilitySupported with conditions
The manual documents an auxiliary supply with a UPS breaker and a lead-acid battery, a ring network switch and the power-on and power-off sequence. Client recovery and data buffering for the monitoring interface are not described.2
RuggednessSupported with conditions
IP54 and C4 (2H2) or IP55, IP65 PCS and C4M (2H3), -25 to +55 °C and up to 2000 m are published for outdoor installation.23
ScalabilityLimited
Up to three battery cabinets per AC cabinet are shown, and the brochure and product page give different parallel-cabinet limits (10 and 8). The number of monitoring clients and polling capacity are not published.14
LifecycleSupported with conditions
Deye ESS publishes dated, numbered manual issues for both variants and a dated brochure. Record firmware and the point-list revision at commissioning and repeat the comparison after an update.23

Setup

  1. Record the installed system

    Record the AC cabinet nameplate (MC-L430-2H2 or MC-L430-2H3), the number of MC-L430-BC-2 battery cabinets, any MS-MPPT400-2 or STS cabinet, the MS-EMS and the firmware shown in Deye EMS. The brochure allows at most three battery cabinets without a PCS in parallel with one AC cabinet. It states up to 10 cabinets in parallel and the product page 8, so confirm the system limit with Deye for the design.

  2. Ask Deye for the Modbus TCP point list

    The 2H2 manual Issue 06 and 2H3 manual Issue 07 list Modbus TCP in the technical specifications but do not publish the register table or name a third-party port. Ask Deye ESS for the endpoint (IP address, TCP port and unit identifier), the point list for the installed firmware and whether the cabinet or the MS-EMS serves it. Ask whether a second client may poll while the MS-EMS is running.

  3. Configure the first reads

    In Edge, add a Modbus TCP device at the address Deye gives. From the point list, read identity, operating state, AC active power, state of charge and the alarm words first, with the function code, data type, scale, word order and sign the list states. Compare each value with Deye EMS or the Deye ESS app at the same time before adding more points. A timeout or exception is missing data, not zero.

  4. Fit the ZEM on the AC feeder

    The two PCS modules each carry up to 166.7 A at 380 V (159.5 A at 400 V), so the cabinet feeder carries up to about 333 A per phase; 1000 A Rogowski coils suit it. A qualified electrician fits them on the three phases between the AC power distribution unit and the site switchboard and takes the ZEM voltage reference from the same circuit. Record which direction is import.

  5. Compare during an existing schedule

    During a charge or discharge the MS-EMS already schedules, compare the ZEM active power with the cabinet power in Deye EMS over the same interval. Keep the site connection meter separate: it includes loads and PV. Send no new command for the check; dispatch stays with the MS-EMS or the site controller.

Common questions

How does the MC-L430-2H3 differ from the MC-L430-2H2?
Power, energy and DC ratings are the same. The 2H3 manual gives IP55 for the battery compartment and chiller control box, IP65 for the PCS, corrosion grade C4M with C5M optional and a noise level of 75 dBA or less at 1 m. The 2H2 manual gives IP54 and C4 or better.23
What PCS is inside the MC-L430-2H2?
Two SUN-100K-PCS01HP3 modules. Each is rated 100 kW and 110 kVA with a 630 to 1000 V battery voltage range.24
Can Edge charge or discharge the cabinet?
Not from this guide. It configures reads only. Charge, discharge, export limiting and backup behaviour stay with the MS-EMS or site controller, and any control needs the site owner’s and Deye’s agreement.25