A switchboard with existing meters may need only a connection to the building network. For a new metering point, the estimator also needs the feeder details and a suitable enclosure. Photograph the full meter label where equipment is already installed. Measurlogic uses different BACnet object maps for different communications options.
Identify the meter at the feeder
| Meter | What changes the quote |
|---|---|
| DTS 305 | Check the existing CT output and whether the operator wants a separate front-panel display. |
| DTS 307 | Measure available DIN rail space. Record whether neutral or an auxiliary supply is available for the ordered version. |
| DTS 310 | For a three-wire feeder, check the line-powered variant and the installed network or pulse output. |
| DTS SMX | Identify the surface enclosure location and cable route. On a generation feeder, ask for import and export requirements separately. |
| DTS SKT | Record the socket form and whether the meter senses current internally or takes a 5 A CT input. |
| DTS DC | Obtain the DC voltage range, grounding arrangement and current sensor signal. Confirm which direction represents consumption. |
Compare one reading
On an AC meter labelled BACnet MS/TP ML, map R23A gives total active power as Analog Input 5528 in kW. On an Ethernet meter covered by the V2.0U BACnet/IP map, total active power is Analog Output 5528 in W. A point schedule containing only the number 5528 loses both distinctions. Record the object type and the engineering unit with the instance.
For a stable feeder, read Present_Value and compare the result with the operator’s local reference at the same time. Convert watts to kilowatts once if the reference uses a different unit. On a bidirectional circuit, identify the operating direction during the check. For monthly consumption reporting, use the appropriate energy counter and compare the change between two readings.
Prepare the enquiry
Group installed meters by network and model. List the Device instance and router for each serial trunk and the Ethernet connection for each IP meter. Include the CT type, reporting interval and one checked point per configuration in the project enquiry. For a site with several brands, the power meter retrofit guide covers commissioning and collection across the wider panel.