Building performance

EPBD recast 2024: requirements and building automation rules

What the EPBD recast, Directive (EU) 2024/1275, requires and when: zero-emission buildings, renovation standards, solar, EPCs and Article 13 BACS rules.

The Energy Performance of Buildings Directive (EPBD) sets the framework that every national building energy rule in the EU must follow. Its 2024 recast, Directive (EU) 2024/1275, entered into force on 28 May 2024, and Member States had to transpose most of it into national law by 29 May 2026. It makes zero-emission buildings the standard for new construction, sets minimum energy performance standards that force renovation of the worst non-residential buildings, phases in solar installations, puts energy performance certificates on a common A to G scale and requires building automation and control systems (BACS) in larger non-residential buildings.

This guide summarises the recast as a whole, then works through Article 13: building automation, indoor environmental quality and automatic lighting control, the parts that decide what a building must measure and control.

What the EPBD requires: the 2024 recast at a glance

RequirementArticleWhat it setsDate in the Directive
Transposition35Most provisions in national law29 May 2026
Zero-emission new buildings7New buildings owned by public bodies, then all new buildings1 January 2028; 1 January 2030
Non-residential minimum energy performance standards9(1)National thresholds set at the worst-performing 16%, then 26%, of the non-residential stock; every building must be renovated below them2030; 2033
Residential renovation trajectory9(2)Average primary energy use of residential buildings down 16%, then 20 to 22%, from 2020, with at least 55% of the reduction from renovating the 43% worst-performing residential buildings2030; 2035
Solar energy installations10(3)Where technically and economically suitable: new public and non-residential buildings over 250 m²; existing public buildings over 2,000 m², 750 m² and 250 m²; existing non-residential buildings over 500 m² at major renovation or permitted works; all new residential buildings31 December 2026; 2027, 2028 and 2030; 31 December 2027; 31 December 2029
Renovation passports12A national scheme, voluntary for owners unless the Member State makes it mandatory29 May 2026
Building automation and control13(9) and 13(10)BACS in non-residential buildings with covered systems over 290 kW, then over 70 kW31 December 2024; 31 December 2029
Indoor environmental quality monitoring13(10)(d)IEQ monitoring added to the BACS capabilities29 May 2026
Automatic lighting controls13(12)Zoned controls with occupancy detection in the same buildings31 December 2027 (290 kW); 31 December 2029 (70 kW)
Fossil-fuel boiler incentives17(15)No financial incentives for stand-alone fossil-fuel boilers1 January 2025
Energy performance certificates19A closed A to G scale: A is a zero-emission building, G the worst-performing buildings in the national stock; an optional A+ class29 May 2026 template

Sources: Directive (EU) 2024/1275 and the European Commission's EPBD pages. The dates are those of the Directive. A national law may bring a date forward, set the thresholds that make each standard operational, and decide how a building proves compliance.

For energy and building-services teams, three of these requirements produce new measurement work. The minimum energy performance standards rank buildings by measured or calculated performance, so a portfolio needs a defensible energy boundary for each building. The zero-emission standard and the certificate scale depend on the building's energy need and on-site renewable supply, which needs generation and import metering. Article 13 requires monitoring, logging and analysis of energy use itself. The rest of this guide covers Article 13.

How Article 13 applies across countries

Article 13 sets a common direction for building automation, indoor environmental quality and automatic lighting control. It does not create one identical installation rule for every building in Europe. Member States implement the Directive through national law, and those national rules define the enforceable scope, exemptions, evidence and inspection process.

That distinction matters for projects planned across several countries. France already applies a 70 kW BACS regime with a defined timetable and a separate CEE funding route for qualifying GTB work. Germany has enacted a 70 kW requirement in its Building Energy Act. Ireland and Italy have national rules for parts of the stock above 290 kW while later stages still need to be read from current national measures. A European portfolio can use one technical evidence model, but it cannot use one legal checklist without checking each jurisdiction.

Which non-residential buildings Article 13 covers

Article 13(9) tells Member States to require BACS, where technically and economically feasible, for non-residential buildings whose covered systems have an effective rated output:

StageCovered system outputEU deadline
First BACS stageOver 290 kW31 December 2024
Extended BACS stageOver 70 kW31 December 2029

The covered systems are heating, air-conditioning, combined space heating and ventilation, and combined air-conditioning and ventilation. The threshold is not the building's electrical connection, annual energy use, floor area or sum of every load in the building.

For each site, retain the equipment schedule, nameplate ratings, system arrangement and calculation used to determine effective rated output. Record whether several generators form one system and how duty and standby plant were treated. If a project relies on technical or economic infeasibility, retain the national test and the dated evidence used to reach that conclusion.

The 31 December 2024 stage reflects a requirement already present under the earlier EPBD. The recast adds the 70 kW stage. A missed 2024 national deadline does not become a future requirement merely because a project begins later. Check the current national position and any enforcement or remediation process.

What the BACS must be capable of

Article 13(10) defines outcomes for the complete building automation and control system. It must be capable of:

  1. continuously monitoring, logging and analysing energy use, and allowing energy use to be adjusted;
  2. benchmarking the building's energy efficiency, detecting losses in the efficiency of technical building systems, and informing the person responsible for facilities or technical building management about improvement opportunities;
  3. communicating with connected technical building systems and appliances, and operating across different proprietary technologies, devices and manufacturers; and
  4. monitoring indoor environmental quality.

The Commission's implementation guidance says the first three capability groups could correspond to Class B BACS under EN ISO 52120-1. The word "could" is important. Use the standard as a structured way to assess functions and gaps. Do not treat a class label on one controller as proof that the building, its connected systems and its operating process meet national law.

A complete design maps each Article 13 outcome to equipment, software, data and an accountable person. For example, a power meter can measure chiller input, a controller can expose run state and set point, an analytics service can detect a rising kWh per unit of cooling, and a work process can assign the resulting alarm. No single component establishes the complete outcome.

Adjustment does not mean uncontrolled remote access

The ability to adjust energy use should be designed through the plant's documented control hierarchy. Safety, equipment protection, anti-cycle logic and local limits remain in the manufacturer-approved controller. A supervisory BACS may request an operating mode, schedule or bounded set point through a documented interface.

Start read-only. Confirm object or register identity, unit, data type, timestamp and quality against the local display and an independent measurement. Enable writes only after the manufacturer identifies the writable point, priority or command path; the building operator approves the control boundary; and communication loss, rejected commands and local override have safe outcomes. Record commanded state and achieved state separately.

Indoor environmental quality and the 2026 transposition date

The recast adds indoor environmental quality monitoring to the BACS capabilities. Article 13(10)(d) required this capability by 29 May 2026 for buildings covered by Article 13(9), subject to the Directive's technical and economic feasibility condition. Member States had to implement the provision in national law by that date, and their measures determine how it applies in practice.

The Directive does not prescribe one universal sensor pack. Choose parameters and locations from the occupied space, its use and the technical systems being assessed. A useful plan may include:

  • temperature and relative humidity in representative occupied zones;
  • carbon dioxide where occupancy and ventilation performance make it a useful indicator;
  • other pollutants or comfort parameters where the activity and national guidance justify them;
  • occupancy or a defensible schedule, so conditions can be interpreted in context;
  • ventilation, heating and cooling states serving each monitored zone.

Define the acceptable range, sampling interval, retention period, quality state, alarm threshold and response owner for every point. A plant-room sensor does not represent conditions across offices, classrooms or retail areas. An average can also conceal one persistently poor zone, so retain zone-level values where the system design calls for them.

IEQ monitoring is not a licence to reduce comfort in pursuit of energy savings. Use it to show whether energy and operating changes maintained the agreed conditions. If a control action reduces consumption while temperature or air quality moves outside its band, the result is not a demonstrated efficiency improvement.

Automatic lighting controls are a separate stage

Article 13(12) requires Member States to set automatic lighting-control requirements, where technically and economically feasible, for non-residential buildings with the same categories of covered heating and cooling systems:

Lighting-control stageCovered system outputEU deadline
First stageOver 290 kW31 December 2027
Extended stageOver 70 kW31 December 2029

The controls must be suitably zoned and capable of occupancy detection. This is a separate requirement from installing a BACS. A BACS project should coordinate the lighting-control zones, occupancy signals, schedules and energy measurements, but it should not claim the lighting stage is satisfied merely because the BACS can display a lighting circuit.

National implementation may define system boundaries, exceptions, commissioning and inspection in more detail. Check those measures before specifying coverage or accepting a project.

Residential monitoring and control

Article 13(11) also requires Member States to set requirements for certain new residential buildings and residential buildings undergoing major renovation, where technically, economically and functionally feasible. The functions include continuous electronic monitoring that measures system efficiency and informs owners or managers of significant variation and servicing needs, effective control of energy generation, distribution, storage and use, and the capacity to react to external signals.

Member States may exclude single-family houses undergoing major renovation where installation costs exceed the benefits. National law determines how the requirement applies in practice. Do not carry the non-residential 70 kW threshold into a residential assessment or assume that one domestic product configuration is sufficient in every country.

Build an evidence model that works across a portfolio

A common evidence model reduces repeated engineering without pretending the law is identical.

Evidence layerRecordDecision it supports
Legal scopeCountry, building use, system type, rated output, applicable national provision and exception testWhether the building and system are covered
Energy boundaryMain electricity, fuel, heat and cooling totals reconciled with submetersWhether the monitoring record is complete
Technical systemsEnergy input, useful output, run state, set point, mode, schedule and alarmWhether consumption and efficiency can be explained
Occupied zonesIEQ value, occupancy context, serving plant and acceptable bandWhether operation maintains the intended indoor conditions
InteroperabilityPoint list, protocol, address, unit, type, permissions, timestamp and qualityWhether systems exchange usable data
AdjustmentRequest, priority, limit, local override, achieved state and fallbackWhether a control action is bounded and verifiable
ResponseFinding, recipient, action, completion and measured resultWhether the operator was informed and acted

Commission the chain with known conditions. Compare energy totals with an independent reference. Change a permitted schedule or set point and verify the plant response. Create a defined alarm, interrupt communications and confirm that stale data is visible and recovery is recorded. Test that another system receives the required values with units, timestamps and quality states.

Do not replace missing values with zero or carry the last value forward without a quality flag. Either choice can turn a communications failure into false evidence. Keep raw measurements, calculated indicators, operator annotations and control events distinct.

Check the national rule before making a compliance claim

The EPBD's transposition deadline for the relevant provisions was 29 May 2026. Transposition is not the same as uniform implementation. A national measure can define the threshold calculation, feasibility test, deadline path, competent inspector, maintenance duties, evidence retention and penalties.

Before procurement, answer these questions from the current national text:

  1. Which building uses and technical systems are in scope?
  2. How is effective rated output calculated for multiple generators or systems?
  3. Which date applies to an existing building, replacement project or new permit?
  4. How are technical and economic feasibility tested and documented?
  5. Which BACS, IEQ and lighting functions apply now?
  6. What inspection, maintenance, training and record-retention duties apply?
  7. Who owns the obligation and which authority enforces it?

Our French BACS guide, German GEG guide, Irish BACS guide and Italian BACS guide apply this method to current national sources.

Where EpiSensor fits

EpiSensor provides an operational measurement and integration layer around existing building plant. Electricity monitors can separate heating, cooling, ventilation, pump and lighting feeders. Pulse and M-Bus interfaces can collect gas, water and heat-meter totals. Modbus and analogue interfaces can bring documented controller states and process measurements into Edge. A Gateway can retain the record on site and serve collected data onward over Modbus TCP, MQTT or HTTP.

That can close measurement gaps, connect older equipment and provide independent evidence to a wider BMS. It does not make a building compliant by itself. The complete installation must provide every applicable national function, cover the required systems and zones, and pass the required commissioning, maintenance or inspection process.

Use the HVAC energy-monitoring application to define plant boundaries, then the BMS and SCADA integration application to plan the data path. Keep compliance sign-off with the building owner, designer and competent national specialist.

Common questions

What is the EPBD?

The Energy Performance of Buildings Directive is the EU law that sets how Member States regulate the energy performance of new and existing buildings. The current version is the 2024 recast, Directive (EU) 2024/1275. It makes zero-emission buildings the standard for new buildings, sets minimum energy performance standards for the worst non-residential buildings, phases in solar installations, harmonises energy performance certificates and requires building automation and control in larger non-residential buildings.

What are the EPBD deadlines?

The recast entered into force on 28 May 2024 and most provisions had to be transposed by 29 May 2026. New buildings owned by public bodies must be zero-emission from 1 January 2028 and all new buildings from 1 January 2030. The first solar stage covers new public and non-residential buildings over 250 m² by 31 December 2026. Building automation applies above 290 kW by 31 December 2024 and above 70 kW by 31 December 2029. National law sets the dates that apply in each country.

What is the EPBD building automation threshold?

Article 13 uses the effective rated output of covered heating, air-conditioning, combined heating and ventilation, or combined air-conditioning and ventilation systems. The stages are over 290 kW by 31 December 2024 and over 70 kW by 31 December 2029, where technically and economically feasible.

Does the EPBD require building automation in every building over 70 kW now?

No. The 70 kW non-residential stage is due by 31 December 2029 and must be implemented through each Member State's law. Current national thresholds, exemptions and enforcement differ. Check the law in the country where the building is located before defining compliance scope.

What does an EPBD building automation system have to do?

Article 13 requires continuous energy monitoring, logging and analysis; adjustment of energy use; benchmarking and loss detection; information for the responsible operator; interoperable communication; and indoor environmental quality monitoring. The complete system must provide the applicable functions.

Is EN ISO 52120-1 Class B mandatory under the EPBD?

The Commission's implementation guidance says the Article 13(10)(a) to (c) capabilities could correspond to Class B BACS under EN ISO 52120-1. That is guidance for assessing capability, not wording that makes one product label or certificate an automatic proof of national legal compliance.

Does an energy dashboard satisfy Article 13?

A dashboard may provide part of the monitoring and analysis function. It does not by itself prove adjustment, efficiency-loss detection, operator notification, interoperability, indoor-environment monitoring or the requirements of national implementing law.