Pixii: Modular battery storage built from swappable 3.3 kW power converters

Pixii designs modular lithium iron phosphate battery systems, from 50 kW cabinets to 1 MW containers, built on its own hot-swappable power converter. It sells to grid operators, industrial sites, EV charging operators and telecom tower owners, directly and through partners.

Company-reported

250 MW+ Installed energy storage worldwide1
NOK 177 million Revenue in 202222 Reported 2023
90%+ Share of sales exported22 Reported 2023

Summary

Best for
Utilities, industrial sites, EV charging hubs and telecom operators wanting storage that grows in small steps and is serviced by swapping power modules on site.
Less suited to
Integrators who need open register maps and datasheets: documents are sent by email after a form, and no ISO 27001 or IEC 62443 certification is published for the controls.
Deployment
On-site outdoor or indoor cabinets and containers controlled locally by the Pixii Gateway or Energy Architect EMS, with remote monitoring through Pixii Cloud in a browser.
Data in
Modbus RTU and TCP, MQTT, HTTPS and CAN bus on the gateway over Ethernet, RS-485, Wi-Fi and optional 4G; the EMS adds DNP3, a REST API and OCPP for chargers.
Pricing
Not published; systems are quoted per project.
Assessed
15 October 2026, against our March 2026 criteria

Overview

Pixii was registered in Kristiansand in March 2018 and spent its first years on grid pilots in Norway. In 2020 the network operator Elvia connected two 65 kWh Pixii battery packs to its grid at Sjusjøen to test whether storage could relieve local peaks more cheaply than new cables, as Tek.no reported. Growth followed quickly: Deloitte ranked Pixii first in its 2023 Technology Fast 50 for Norway on revenue growth of about 10,205% between 2019 and 2022, with 2022 revenue of NOK 177 million and more than 90% of sales exported, according to Energy Industry Review.

The design choice that sets Pixii apart is that its systems are assembled from many small, identical power converters rather than one central inverter. The 3.3 kW PixiiBox is a hot-swappable bidirectional module, and the same unit sits inside a home battery, a 50 kW cabinet and a 1 MW container. A failed module can be exchanged on site without replacing the inverter, and capacity grows in small steps. The approach comes from telecom power, where rack-mounted rectifiers on a 48 V bus are standard, and Pixii still sells a hybrid UPS and battery cabinet for telecom sites.

Pixii now positions itself as a supplier of complete storage systems with its own controller and energy management software, sold to utilities, industry, EV charging operators and tower companies. On its about page the company reports more than 250 MW of installed storage worldwide.

Offering

Pixii sells hardware systems with its own control software, priced per project and supplied directly or through partners. Its range is grouped into families:

Cabinets for commercial, industrial and telecom sites

  • PowerShaper: an outdoor or indoor cabinet rated at 50 kW with 51.2 kWh installed (46.1 kWh usable) of lithium iron phosphate, offered with fan-filter, air-conditioned or indoor thermal management, or as an empty cabinet (PowerShaper specifications).
  • PowerShaper XL: larger cabinets from 40 kW / 96 kWh to 60 kW / 225 kWh, plus indoor multi-cabinet sets up to 50 kW / 321 kWh (PowerShaper XL).
  • PowerShaper TC: a combined UPS and battery cabinet for 48 V DC telecom sites, delivered as turnkey telecom power with Enetek Power (telecom page).

Utility and EV charging scale

  • PowerBase XL: 540 kW / 2 MWh outdoor units (PowerBase XL).
  • PowerBase XLP: 1 MW / 2 MWh with fan-filter or multi-cooling (PowerBase XLP), used for battery-buffered truck charging.
  • PowerNode: introduced in September 2026, with a 500 kW conversion unit (PCS 500), a 261 kWh battery cabinet (PBC 261), an AC combiner and an all-in-one 125 kW / 261 kWh unit, so power and energy scale separately for multi-MW sites (PowerNode 500 announcement).

Residential and OEM

  • Pixii Home: a 10 kW home battery with 10 or 20 kWh, in fan-filter and hybrid (PV) versions (Pixii Home).
  • Building blocks: the PixiiBox, the Pixii Gateway and battery modules, sold to other system builders.

Software and services

The Pixii Energy Architect EMS and the Pixii webapp and Pixii Cloud cover control and monitoring. Services include commissioning, an RMA process, the Pixii Academy training site and service level agreements.

Products and platforms

  1. PixiiBox 48/3300

    Power conversion module

    Hot-swappable 3.3 kW bidirectional AC/DC converter with an MPPT solar input, also sold to other system builders.8

Technology

Every Pixii system is built on the PixiiBox 48/3300, a hot-swappable bidirectional converter with 3.334 kW of AC power, a 44 to 58 V battery range, an MPPT solar input of 100 to 380 V and a maximum grid efficiency of 96.9% (PixiiBox specifications). Three modules, one per phase, make the minimum three-phase system, and a PowerShaper cabinet holds up to 15. Batteries are 5.12 kWh lithium iron phosphate blocks in 3U rack units, used to 90% depth of discharge, with a stated life of 3,850 cycles at 1C or 5,800 cycles at 0.5C to 70% state of health (PowerShaper 50 kW datasheet page).

Control and interfaces

The Pixii Gateway runs PixiiOS and connects the cabinet to the outside world over RS-485, CAN bus, Ethernet, a Wi-Fi access point for local setup, USB and optional 4G. It speaks Modbus RTU, Modbus TCP, MQTT and HTTPS, can act as master over a cluster of cabinets, and accepts set points from a third-party EMS. The Energy Architect EMS is a Linux controller programmed in IEC 61131 (CODESYS) that adds DNP3, a REST API and OCPP for chargers, runs peak shaving, self-consumption, load shifting, arbitrage and frequency services, and keeps operating locally if the cloud connection drops. Pixii lists encryption, secure remote access and logical network segregation for it, without naming a security standard.

Standards

The product pages list IEC/EN 62477-1 for converter safety, cybersecurity under the Radio Equipment Directive from August 2025, IEC 62619, UL 1973 and UN 38.3 for batteries, and grid codes including VDE-AR-N 4105 and 4110, EREC G99, IEC/EN 50549-1 and AS/NZS 4777.2. The 50 kW page notes that several grid approvals currently apply to the PixiiBox, with approval of the complete system still in progress. Datasheets, manuals and configuration guides are sent by email after a form in the document center; no register map is published openly.

Standards and technical interfaces

  1. ISO 9001:2015

    Quality management1

  2. ISO 14001:2015

    Environmental management1

Customers

Stadtwerke Hünfeld

The municipal utility in Hünfeld, Hesse, runs Pixii's largest system: 12 PowerBase XL units on three 2.5 MVA transformers, 6.48 MW and 21.6 MWh, delivering frequency containment reserve, automatic frequency restoration reserve, energy trading and reactive power for the local grid. Pixii's August 2025 case study says it was built without an EPC contractor and is operated through an external EMS. Energynomics reported the same project in February 2025 at 6.41 MW and 21.62 MWh, alongside a second 540 kW / 1.39 MWh system at the town's wastewater plant paired with a 1 MWp solar park.

Milence

At IAA Transportation in Hanover in September 2026, a PowerBase XLP rated 1 MW / 2 MWh fed an Alpitronic HYC1000 megawatt charger for electric trucks. Pixii's case study reports more than 1 MW of charging from a 260 kW grid connection and says the system will move to Milence's Osnabrück hub. TRANSPORT described five Pixii battery cabinets buffering a grid connection of about 200 kW.

A2A E-Mobility

In Monza, Italy, two PowerShaper systems with 100 kWh of storage support five 300 kW DC chargers, one 14 kW AC charger and 11 kWp of rooftop solar, allowing 12 simultaneous charging sessions on a limited connection (August 2026 case study).

Elvia

The Norwegian network operator's 2020 pilot at Sjusjøen used two 65 kWh packs for peak relief, not backup, as Tek.no reported.

All outcomes above except the Elvia pilot and the trade press figures are company-reported.

Markets

Pixii sells into seven segments: distribution system operators, telecom and tower companies, commercial and industrial sites, EV charging, residential and real estate, microgrids and off-grid sites, and OEMs. Its value stacking page combines cost savings (peak shaving, arbitrage, self-consumption, backup) with revenue from frequency markets, local flexibility markets, wholesale trading and voltage support, generally reached through brokers, virtual power plants or EMS partners rather than a trading desk of its own.

Europe

Germany is the largest visible market, with the Hünfeld utility systems and the Milence truck charging project, followed by Italy, the Czech Republic and Norway. Pixii Home launched in Sweden in February 2024, according to pv magazine.

India

Pixii opened an office in New Delhi in October 2024. In May 2025 TVS Indeon, a subsidiary of Lucas TVS, agreed to deploy Pixii storage for commercial and industrial customers (Machinist). In July 2026 Havells India signed a memorandum of understanding that runs from pilot installations to a jointly developed all-in-one product and local assembly (Pixii; Power Line).

North America and Australia

Pixii Americas is based in Littleton, Colorado. In January 2026 the Canadian company Aegis Critical Energy Defence announced a partnership with it to supply batteries to Canadian telecom networks (Newsfile). Pixii also lists an off-grid EV charging project in the Australian outback among its projects.

Telecom sales lean on Enetek Power, which Pixii describes as a sister company within Eltek Holding.

Company

Pixii AS was founded on 6 March 2018 and entered in the Norwegian business register on 23 March 2018 under the name EH Tech AS, taking the name Pixii AS that May (Brønnøysund register). The register gives its business address in Kristiansand, where its only registered business unit is located, and records 43 employees as of October 2026. The website and recent press releases use an Oslo address, Sommerrogata 13-15, and the register's postal address is also in Oslo; this profile uses Kristiansand as the headquarters because that is the registered business address and was given as the company's base by pv magazine and Business Norway.

Ownership and funding

Pixii does not publish its shareholders. Its about page refers only to strong ownership, and its telecom page calls Enetek Power a sister company within Eltek Holding, which places Pixii in the same private ownership group. No venture rounds have been announced. The register shows share capital of NOK 2,268,654, last changed on 30 October 2025, with articles of association updated in August 2025; the company is not in liquidation or bankruptcy, and its most recent filed accounts are for 2025.

Recognition and growth

Deloitte's 2023 Technology Fast 50 placed Pixii first in Norway on four-year revenue growth (Energy Industry Review), and Innovation Norway and Export Finance Norway named it newcomer of the year in 2024 (Business Norway). The company holds ISO 9001:2015 and ISO 14001:2015 certification. Revenue for years after 2022 has not been published in the sources used here.

Assessment

A credible modular storage manufacturer with an unusual converter-based design, real utility and EV charging references and published interfaces on the gateway and EMS. The weaker points are disclosure and security: datasheets and manuals sit behind an email form, there is no public register map, the only security evidence is a Radio Equipment Directive line and generic EMS claims, ownership is described only through a sister-company reference, and no revenue after 2022 is public. The 250 MW installed figure is company-reported and not broken down.

  • Interoperability

    Company sources The gateway lists Modbus RTU and TCP, MQTT, HTTPS and CAN over RS-485, Ethernet, Wi-Fi and 4G, and the EMS adds DNP3, a REST API and OCPP.

    Full note and sources

    Hünfeld runs on an external EMS, which shows third-party control works in practice. No register map, API reference or named integration partner is public, so depth cannot be checked, and every interface claim comes from Pixii's own pages.

    Sources: 3, 9, 10, 16

  • Scale

    Independent sources Pixii reports more than 250 MW installed.

    Full note and sources

    Verifiable references are a 6.4 MW / 21.6 MWh utility system in Germany, a 1 MW / 2 MWh truck charging buffer, a 100 kWh Italian charging hub and a 2020 Norwegian pilot. Partnerships in India (TVS Indeon 2025, Havells 2026) and Canada (Aegis 2026) are at pilot or agreement stage. The register shows 43 employees in October 2026.

    Sources: 1, 16, 17, 18, 21, 25, 26, 27, 28

  • Stability

    Independent sources Founded in 2018 and trading for eight years.

    Full note and sources

    Revenue reached NOK 177 million in 2022 with growth of about 10,205% since 2019, but later figures are not public. Ownership is private and only described through Enetek Power being a sister company within Eltek Holding. The register shows no liquidation or bankruptcy, and a capital change in October 2025; no venture rounds or debt facilities are disclosed.

    Sources: 1, 12, 21, 22

  • Functionality

    Company sources Covers the battery job well for its size class: modular LFP storage from a 10 kW home unit to 1 MW / 2 MWh containers, a separate PCS and battery platform for multi-MW sites, a 48 V telecom UPS, off-grid operation, and an EMS for peak shaving, arbitrage, self-consumption and frequency services that runs locally without the cloud.

    Full note and sources

    Market trading itself is left to brokers or VPP partners.

    Sources: 3, 6, 7, 10, 12, 13, 19

  • Security

    Company sources Public evidence is thin.

    Full note and sources

    The EMS page lists encryption, secure remote access, network segregation and a Linux platform without naming a standard, and the product page cites Radio Equipment Directive cybersecurity from August 2025. No ISO 27001, IEC 62443, penetration test summary or vulnerability disclosure process is published, and the gateway allows remote control of grid-connected batteries.

    Sources: 3, 9, 10

  • Quality

    Independent sources Product pages publish detailed electrical, thermal and battery data, cycle life to 70% state of health and a long list of grid codes and safety standards, though the 50 kW page notes that system-level grid approval is still in progress for some codes.

    Full note and sources

    Independent reports cover the Elvia pilot, the Hünfeld systems and the IAA truck charging demonstration. ISO 9001 and ISO 14001 are held.

    Sources: 1, 3, 8, 24, 25, 29

  • Transparency

    Independent sources Specifications, standards and case studies are public in unusual detail on the website.

    Full note and sources

    Datasheets, manuals and configuration guides require a form and arrive by email, pricing is not published, the customer portal page was under maintenance, shareholders are not named and financial results after 2022 are not published. The headquarters is given as Oslo on the website and Kristiansand in the register.

    Sources: 1, 11, 14, 21, 22

How we score companies

Alternatives in Battery energy storage systems

What to look for in Battery energy storage systems

References

  1. About - Pixii (opens in a new tab)
  2. PowerShaper - Pixii (opens in a new tab)
  3. PowerShaper, 50kW/51kWh, Fan-filter, LFP - Pixii (opens in a new tab)
  4. PowerShaper XL - Pixii (opens in a new tab)
  5. PowerBase XL - Pixii (opens in a new tab)
  6. PowerBase XLP - Pixii (opens in a new tab)
  7. Pixii Home - Pixii (opens in a new tab)
  8. Building blocks, PixiiBox - Pixii (opens in a new tab)
  9. Building blocks, Pixii Gateway - Pixii (opens in a new tab)
  10. Monitoring and control, Pixii Energy Architect (EMS) - Pixii (opens in a new tab)
  11. Monitoring and control, Pixii webapp - Pixii (opens in a new tab)
  12. Telecom and TowerCos - Pixii (opens in a new tab)
  13. Value stacking - Pixii (opens in a new tab)
  14. Document center - Pixii (opens in a new tab)
  15. Projects - Pixii (opens in a new tab)
  16. Powering the future - How Stadtwerke Hünfeld is stabilizing the grid and unlocking new revenue - Pixii (opens in a new tab)
  17. Smarter EV charging with integrated energy storage - Pixii (opens in a new tab)
  18. 1 MW electric truck charging from a 260 kW grid connection - Pixii (opens in a new tab)
  19. PowerNode 500 - When energy storage becomes system infrastructure - Pixii (opens in a new tab)
  20. Pixii and Havells partner to accelerate battery energy storage in India - Pixii (opens in a new tab)
  21. Virksomhetsopplysninger: PIXII AS (920 652 964) - Brønnøysundregistrene (opens in a new tab)
  22. Pixii, Norway’s Fastest-growing Tech Company (opens in a new tab)
  23. Pixii unveils residential lithium-ion battery - pv magazine Global (opens in a new tab)
  24. Tester batterier i strømnettet - Tek.no (opens in a new tab)
  25. Collaboration between Pixii and Stadtwerke Hünfeld, a model of technological innovation for transforming energy infrastructure - energynomics.ro (opens in a new tab)
  26. TVS Indeon Partners with Pixii to Expand Deployment of Battery Storage Systems in India (opens in a new tab)
  27. Havells partners with Pixii AS to enter battery energy storage segment (opens in a new tab)
  28. Aegis Powers Up Canada's Telecom Backbone with Pixii Americas Partnership-Top-3 Operator Talks Underway (opens in a new tab)
  29. IAA TRANSPORTATION 2026: Druckbetankung per Megawatt-Charging (opens in a new tab)
  30. Pixii enables the green transition with battery-based energy storage (opens in a new tab)

This profile does not imply a commercial relationship with Pixii and may contain inaccuracies.