Base Power Company: Company-owned home batteries that back up houses and serve the Texas grid

Base Power builds, installs and owns home batteries that keep houses powered in outages, and dispatches them as a fleet in the ERCOT market and for utility partners. It sells backup and fixed-rate electricity to homeowners in Texas and Illinois, and battery capacity to utilities and co-operatives.

Company-reported

30,000+ Homeowners served in Texas and Illinois1
500+ MWh Battery fleet in operation23
103 MW Registered in ERCOT's ADER pilot, 71% of the total7
6 Utility partners3

Summary

Best for
Texas utilities and co-operatives that want dispatchable peak capacity in months without owning hardware, and homeowners in Base's Texas or ComEd areas who want whole-home backup without buying a battery.
Less suited to
Homeowners who want to own their battery, choose its brand or use it for their own tariff optimisation, and aggregators wanting software for a mixed fleet: Base dispatches only its own hardware, in Texas and northern Illinois.
Deployment
Base owns and maintains a ground-mounted battery behind the home's meter, connected through its own gateway and cloud. Utilities dispatch from Base's operator dashboard or their EMS or SCADA; ERCOT dispatches the ADER resources every five minutes.
Data in
Battery telemetry over Modbus to Base's gateway, then protobuf over gRPC with mutual TLS to its cloud at two-second resolution. ERCOT dispatch and telemetry over ICCP; utility signals from the operator dashboard, EMS or SCADA.
Pricing
Published by area: in the Oncor area in October 2026, $695 installation, $19 a month and about 13.9¢/kWh all-in; lower installation fees in some partner co-op areas. Utility capacity is priced per contract.
Assessed
15 October 2026, against our March 2026 criteria

Overview

Base Power started selling in Texas in 2023 with an unusual answer to the cost of home batteries: the homeowner does not buy one. Base designs the battery, builds it in its own Austin factory, installs it with its own electricians, keeps ownership and earns most of its income by dispatching the fleet into the wholesale market and to utilities. The household pays a one-off installation fee, a monthly membership and, where Texas retail choice allows, buys its electricity from Base as a registered retail electric provider. The company states this plainly: grid revenue is what keeps the backup cheap (Base Core).

That model sets it apart from the two usual routes to a residential virtual power plant. Aggregators such as installer-led programmes enrol batteries that customers already own, so the operator controls a mixed fleet it did not choose. Utility-scale storage developers build one site and wait in the interconnection queue. Base owns a uniform fleet of its own hardware behind the meter, which it presents to utilities as capacity that can be energised in months (Utility partnerships).

The approach has drawn unusually large private funding for a company founded in 2023, and by Base's own count it holds most of the capacity registered in Texas's distributed battery pilot (ADER Phase IV). In April 2026 TIME named it among the most influential energy companies of the year (TIME). Its first market outside Texas, the ComEd area around Chicago, opened in June 2026 (Illinois launch).

Offering

Base Core

Base Core is the company's current home battery: 39.2 kWh of lithium iron phosphate storage in a ground-mounted cabinet, with a second unit for 78.4 kWh (Base Core, specifications). Base's utility page rates the system at 20 kW (Utility partnerships). It switches the home to battery power automatically within seconds, runs from -22 to 122 °F, has a built-in port for recharging from a portable generator and charges from existing rooftop solar. Base says it lasts up to 36 hours at reduced household load. Earlier systems of 25 and 50 kWh are still listed on the specifications index (battery specs). Base retains ownership and covers maintenance for the life of the agreement; the agreement runs with the home, so a buyer can take over the service or Base removes the system (How it works).

Energy and backup plans

In Texas retail-choice areas Base sells a fixed-rate electricity plan with or without a battery. In October 2026 its Oncor-area Energy plus Backup offer listed a $695 installation fee, a $19 monthly membership and an all-in rate of about 13.9¢/kWh (Base Core). In co-operative and municipal territories where customers cannot switch supplier, such as CoServ, GVEC and Austin Energy, Base sells backup only and the utility remains the supplier. In Illinois Base supplies electricity as a licensed alternative retail supplier at rates it sets at least 25% below ComEd's default supply price (Illinois launch). Base Energy for Business is a fixed-rate commercial electricity plan in ERCOT with no battery at the customer's site (Base for business).

Utility fleets

For utilities Base offers local aggregations of its batteries for bulk peaking capacity, faster connection of large loads and relief on constrained distribution circuits. Two commercial structures are offered: Base tolls batteries it owns on a pay-for-performance basis, or builds the fleet and transfers ownership to the utility. In both the utility holds dispatch rights and sees fleet state, availability and delivered power (Utility partnerships).

Homebuilders

Base supplies temporary and permanent electricity service during construction, installs the battery before closing and moves the service to the buyer on closing day. It reports that builders save three to five days per home (Homebuilder partnerships).

Technology

Fleet control and telemetry

Each installation pairs the battery with a Base gateway: a Raspberry Pi running Go software in containers that reads the battery over Modbus, forwards telemetry and executes charge, discharge and follow-load commands from the cloud. Base's fleet engineers describe mutual TLS between gateway and cloud, commands stored in SQLite on the device so they survive restarts, store-and-forward telemetry over protobuf and gRPC, and a move of time-series data from AWS Timestream to Google BigQuery. The fleet reports power flows every two seconds, against the 15-minute data Smart Meter Texas provides; when a home's Wi-Fi is unavailable the gateway falls back to 4G (telemetry stack).

Market and utility dispatch

In ERCOT, Base's retail entity forms one Aggregated Distributed Energy Resource per load zone. Each is modelled in ERCOT's network model, telemetered to the market over ICCP through a redundant connection to ERCOT's wide area network, qualified by following basepoints from security-constrained economic dispatch, and then dispatched every five minutes like a utility-scale battery. Further deployment tests cover ancillary services, in ERCOT's case non-spinning reserve and ERCOT Contingency Reserve Service. It reports about 60 days from installation to market participation (ADER Phase IV). Utility customers dispatch their fleets from Base's operator dashboard or through integration with their own EMS or SCADA; GVEC runs its fleet directly in Base's software (Utility Dive), and El Paso Electric manages dispatch, scheduling and performance monitoring of its pilot (IESNA). Members always keep a minimum backup reserve, and Base quotes sub-second response and up to 500 dispatch cycles a year (Utility partnerships).

Hardware and safety

Base Core is certified to UL 1973, UL 9540, UL 991, UL 1998, UL 1741 and IEEE 1547-2003, and Base's battery systems are listed against UL 9540A. Base also reports IP67 submersion testing to three feet and IPX9K high-pressure water testing (Base Core). Base buys lithium iron phosphate cells rather than making them (Contrary Research) and builds Base Core at Base Factory 1 in Austin, which pv magazine reports is producing thousands of systems a month (pv magazine USA). No information-security certification such as SOC 2 or ISO 27001 is published.

Integrations and interoperability

  1. Rooftop solar

    Distributed generation

    Existing or new solar charges the Base battery, with excess production bought back by Base.5

  2. Portable generators

    Backup generation

    Built-in port for recharging Base Core from a portable generator during long outages.4

Customers

Utility partners

Base reports six utility partners across three metro areas (Utility partnerships). All are in Texas:

  • CoServ (Denton County Electric Cooperative): a 100 MW residential storage programme announced in March 2026, to be installed over two years across about 5,000 homes; CoServ pays only for capacity Base delivers (Canary Media).
  • Guadalupe Valley Electric Cooperative: a 2 MW pilot in Lennar homes from July 2025, expanded in April 2026 to 50 MW across the co-op's territory, with 20 MW targeted by the end of 2026 and the fleet enrolled in ERCOT's ADER pilot (Utility Dive, 2025; Utility Dive, 2026).
  • Austin Energy: 40 MW of residential batteries, dispatched by the utility at peak and able to deliver the full 40 MW for about an hour and a half (Austin Energy).
  • El Paso Electric: up to 10 MW selected through its residential distributed storage pilot, aimed at the 2026 summer peak (IESNA).
  • Bandera Electric Cooperative: launched in March 2025 under a capacity-as-a-service arrangement in which the co-op dispatches the batteries (Canary Media).
  • Farmers Electric Cooperative: Base Core backup for co-op members at a $695 installation fee with no monthly membership (Farmers home backup).

Homes and builders

Base reports serving more than 30,000 homeowners in Texas and Illinois in October 2026, a figure that includes electricity customers without a battery (Base Power). Lennar installs Base systems in new homes in Texas markets (Homebuilder partnerships).

Markets

Base sells in two states. In Texas it serves the retail-choice areas of Oncor, CenterPoint, AEP Texas and TNMP, where it can be the electricity provider, and the CoServ, GVEC, Farmers Electric, El Paso Electric and Austin Energy territories, where it sells backup through utility programmes. Its business electricity plan is limited to the ERCOT market (Base for business). In June 2026 Base opened in the ComEd area of northern Illinois, its first market in PJM, with a warehouse in Bloomingdale and an introductory installation price of $95 for the first 2,000 members (Illinois launch). Latitude Media reports that Base intends to pursue data-centre developers in PJM through partnerships in which home batteries supply capacity for new large loads (Latitude Media).

The site footer also notes that Base offers battery equipment and installation, though not electricity supply, in Colorado and Connecticut, where Base Power Development is a registered home improvement contractor (About Base Power). Outside these areas nothing is offered, and the company's model depends on markets where its batteries can earn wholesale or utility capacity revenue.

Company

Founding and leadership

Base was founded in Austin in 2023 by Zach Dell, its chief executive, and Justin Lopas, who previously built rockets at SpaceX and led manufacturing at Anduril (About Base Power). Its headquarters are at 205 East Riverside Drive in Austin, and the retail business trades as Base Texas REP, LLC (PUCT licence 10338) and, in Illinois, Base Retail, LLC (ICC licence 26-0121).

Funding

  • April 2025: a $200 million Series B co-led by Addition, Andreessen Horowitz, Lightspeed Venture Partners and Valor Equity Partners (TechCrunch). The company then had about 100 staff and had installed 10 MWh in the previous month (Canary Media).
  • October 2025: a $1 billion Series C led by Addition (Contrary Research), reported at a $4 billion valuation (Canary Media).
  • August 2026: a $1 billion Series D at a $13 billion post-money valuation, led by Ribbit, Addition, Valor Equity Partners and JPMorganChase's Strategic Investment Group, taking the total raised to more than $2.5 billion (pv magazine USA).

Growth

The fleet passed 500 MWh in operation by August 2026 (ESS News), up from about 300 MWh in March 2026 (Canary Media). Base's own fleet data shows 205.5 MW of nameplate discharge capacity in August 2026, excluding batteries owned by partner utilities (ADER Phase IV). Base says the money raised is for 20 GWh of domestic battery manufacturing capacity in Austin (Utility partnerships).

Funding history

  1. US$200 million

    Series B

    Investors: Addition, Andreessen Horowitz, Lightspeed Venture Partners, Valor Equity Partners, Altimeter, Terrain, Thrive Ventures, Trust Ventures

    Co-led by Addition, Andreessen Horowitz, Lightspeed and Valor to expand in Texas and plan a domestic factory.22

  2. US$1 billion

    Series C

    Investors: Addition, Andreessen Horowitz, Lightspeed Venture Partners, Thrive Capital

    Led by Addition; reported at a $4 billion valuation.26

  3. US$1 billion

    Series D

    Investors: Ribbit, Addition, Valor Equity Partners, JPMorganChase Strategic Investment Group, Thrive Capital, Andreessen Horowitz, Lightspeed Venture Partners

    $13 billion post-money valuation, announced with the Base Core launch, to expand production at Base Factory 1 in Austin.23

Assessment

Base has the clearest evidence of dispatched scale among US residential VPP operators: more than 500 MWh in operation, 71% of ERCOT's ADER pilot by registered capacity, and four Texas utilities that have announced programmes in their own words or through trade press. The limits are structural. It aggregates only batteries it builds and owns, in Texas and northern Illinois, so it is a capacity supplier rather than software for other fleets. Availability and forced-outage figures are its own, it publishes no information-security certification, and the company is three years old and growing on venture capital, with headline customer and home counts that do not reconcile across sources.

  • Interoperability

    Independent sources Market-side integration is proven: Base forms ERCOT ADER resources telemetered over ICCP and qualified against SCED basepoints, and utilities dispatch from Base's dashboard or their own EMS or SCADA, with GVEC and El Paso Electric running dispatch themselves.

    Full note and sources

    The device side is closed: Base controls only its own batteries through its own gateway, publishes no API, and names no support for OpenADR, IEEE 2030.5 or third-party batteries, inverters or thermostats.

    Sources: 3, 7, 8, 17, 19

  • Scale

    Independent sources Trade press reports more than 500 MWh in operation by August 2026, up from about 300 MWh in March, and Base's fleet data shows 205.5 MW of owned nameplate capacity plus partner-utility fleets.

    Full note and sources

    Base holds 103 of 145 MW registered in ERCOT's ADER pilot. Announced utility programmes total about 200 MW (CoServ 100, GVEC 50, Austin Energy 40, El Paso Electric up to 10). Home counts vary by source: about 10,000 batteries (TIME, April 2026), more than 20,000 homes (June 2026) and more than 30,000 homeowners including energy-only customers (October 2026).

    Sources: 1, 7, 9, 15, 16, 18, 19, 23, 24, 25

  • Stability

    Independent sources More than $2.5 billion raised across three rounds since April 2025, the last at a $13 billion valuation with institutional and bank investors, and its own factory in production.

    Full note and sources

    Against that, the company was founded in 2023, its revenue is small relative to capital raised (Contrary estimated $12 million for 2025), and the model depends on ERCOT price volatility and capacity payments that regulators and market rules can change.

    Sources: 15, 21, 22, 23, 26

  • Functionality

    Independent sources Strong for one job: dispatchable residential storage with a protected backup reserve, two-second telemetry, five-minute wholesale dispatch, ancillary-service testing for non-spinning reserve and ECRS, and utility-controlled capacity sold as tolling or build-transfer.

    Full note and sources

    Under the VPP lens it does not coordinate heterogeneous DER: no EV charger, thermostat, water-heater or third-party battery orchestration, and solar is only a charging source for its own battery.

    Sources: 3, 4, 7, 17, 18

  • Security

    Company sources Base's engineers describe mutual TLS between gateway and cloud and encrypted gRPC telemetry, and the hardware carries UL 1998 for software in safety controls.

    Full note and sources

    No SOC 2, ISO 27001 or IEC 62443 certification, penetration-test summary or trust centre is published for a fleet that a market operator and utilities dispatch. The score reflects that gap.

    Sources: 4, 8

  • Quality

    Independent sources Base Core carries UL 1973, UL 9540, UL 1741, UL 991, UL 1998 and IEEE 1547 listings, plus UL 9540A for Base's battery systems and IP67 and IPX9K test claims.

    Full note and sources

    Base reports 96% fleet availability and a forced-outage rate under 5%, which are its own figures. Independent signals are utility partners expanding after pilots (GVEC from 2 MW to 50 MW) and ERCOT qualification of its aggregations.

    Sources: 2, 3, 4, 16, 17

  • Transparency

    Independent sources Above the category norm on operations: Base publishes monthly fleet nameplate by load zone, its ADER registrations, its telemetry architecture, per-area prices and regulatory licence numbers.

    Full note and sources

    Weaker on commercial and performance detail: no published utility contract terms, availability methodology or dispatch performance data, and customer counts that change meaning between pages.

    Sources: 3, 4, 7, 8, 9, 25

How we score companies

Alternatives in Virtual power plant platforms

What to look for in Virtual power plant platforms

References

  1. Save money. Stay powered. | Base Power (opens in a new tab)
  2. About Base Power | Home battery and energy provider (opens in a new tab)
  3. Utility partnerships | Base Power (opens in a new tab)
  4. Base Core home battery system | Base Power (opens in a new tab)
  5. Base Core home battery specifications | Base Power (opens in a new tab)
  6. Base home battery specs: compare models | Base Power (opens in a new tab)
  7. ADER Phase IV and the capacity crunch | Base Power (opens in a new tab)
  8. Building a Telemetry Stack for The Modern Power Company | Base Power (opens in a new tab)
  9. Base Power launches in Illinois | Press Release (opens in a new tab)
  10. Homebuilder partnerships | Base Power (opens in a new tab)
  11. Lower energy bills for Texas businesses | Base Power (opens in a new tab)
  12. Base Power News & Press | Energy Innovation in Texas (opens in a new tab)
  13. How it works | Base Power (opens in a new tab)
  14. Farmers home backup | Base Power (opens in a new tab)
  15. Base Power to launch 100-MW home battery network for Texas utility (opens in a new tab)
  16. Base Power partnership to mitigate price spikes, load peaks for South Texas co-op, CEO says (opens in a new tab)
  17. Base Power, GVEC partner on 2-MW Texas VPP (opens in a new tab)
  18. Austin Energy expands local battery storage to support reliable, affordable power (opens in a new tab)
  19. El Paso Electric, Base Power Launch Home Battery Pilot (opens in a new tab)
  20. Base Power is adapting its distributed battery storage program for PJM (opens in a new tab)
  21. Base Power lands $200M for rapidly growing home-battery business (opens in a new tab)
  22. a16z backs Base Power in $200M round for home backup batteries (opens in a new tab)
  23. Base Power launches 39.2 kWh U.S-made Base Core home battery, secures $1 billion in new funding (opens in a new tab)
  24. Base Power launches 39.2 kWh US-made home battery (opens in a new tab)
  25. The 10 Most Influential Energy Companies of 2026 (opens in a new tab)
  26. Base Power: Business Breakdown & Founding Story (opens in a new tab)

This profile does not imply a commercial relationship with Base Power Company and may contain inaccuracies.