An electrician reading utility meters mounted on a plant-room wall.

Commercial and industrial energy monitoring

Measure mains, circuits, equipment and existing meters across one site or a portfolio. Analyse and act locally in Edge, or connect the same data to the energy platform you already use.

Measure the site you have

Start at the main incomer, then add the circuits, equipment and existing meters that explain the load, without running a data cable to every point. Protection and power-quality analysis still need instruments chosen for those jobs.

See all hardware
Split-core current transformers around insulated phase conductors inside an electrical cabinet.
Split-core CTs measure current around insulated phase conductors.

What the monitoring system can include

Measurement needConnection pathCheck first
New three-phase power and energy ZEM-65 → Zigbee → Gateway and Edge Current range and conductor size
Existing Modbus RTU equipment RS-485 → ZMB interface → Zigbee → Edge Register map, address and serial settings
Existing IP or BMS equipment Modbus TCP, BACnet/IP or OPC UA → Edge Point identity and write permission
Pulse-output meter Meter pulse output → ZPC → Zigbee → Edge Pulse weight and maximum rate
Wired M-Bus heat meter One meter → ZHM-21 → Zigbee → Edge Meter address and the records you need
Process or utility transmitter 4-20 mA → ZIO, or 0-10 V → ZVO → Zigbee → Edge Range, units and loop power

A typical first site

Most projects start with the main incomer and the three largest loads on one site: one Gateway and four electricity monitors, each measuring one three-phase circuit. The same Gateway carries up to 250 devices as the site grows.

Hardware total €3,499

Excluding VAT, delivery and installation.

System Builder starts from energy monitoring with this kit in mind.

Plan the points, owners and acceptance checks with the first-site planning worksheet.

One monitoring system, from meter to dashboard

Field devices measure the site, the Gateway connects them, and Edge stores, analyses and acts on the data on site. Other platforms can take the same data, and the site keeps collecting without them.

EpiSensor Edge
Platform
EpiSensor Gateway
Zigbee
Modbus
ZEM
ZDR
EpiSensor Zigbee devices
Third-party Zigbee devices
HVAC
Solar PV
Heat pumps
Battery storage
Meters
ZPC
BACnet
LoRaWAN
LoRaWAN devices
ZEM
Core
Retrofit friendly. No new wiring.
Kilometres of range, years on one battery.
Get rich data from legacy meters
Open APIs. Any platform.
Bring your own data SIM.
Sensors and meters report to the Gateway, where Edge runs. Other platforms are optional.

Use Edge on its own

Configure devices, compare data, build dashboards and run rules on site.

Explore Edge

Understand your energy use

Compare circuits and equipment over time, investigate out-of-hours loads and check the effect of operational changes. The chart controls and sensor list stay together in one workspace.

Explore dashboards, data and automation
The Edge Data workspace comparing a main incomer and an air compressor over 30 days, with the time range control and the active series list.
A food plant’s main incomer and air compressor over 30 days. The compressor draws about 18 kW at night and at weekends.

Compare loads

See the main incomer and individual equipment on the same timeline.

Investigate operation

Change time ranges and show or hide sensors to isolate what matters.

Alert and automate

Send an alert or run a rule when a reading crosses a limit.

Common questions

Common questions

How many meters can one Gateway run?

How many meters can one Gateway run?

One ZGW-20 Gateway carries up to 250 devices and around 1,000 sensor feeds. Zigbee devices form a mesh, and each hop reaches roughly 50 m indoors or 300 m outdoors, so the device count and the spacing between devices decide the layout together. Larger sites add Gateways.

What accuracy should I expect?

What accuracy should I expect?

The ZEM-65 is Class 0.5S as a system: its current sensors are connected and calibrated to the meter before it ships, so the accuracy class describes the whole measurement rather than the meter alone.

Does it keep working without the internet?

Does it keep working without the internet?

Yes. Edge runs on the Gateway, so collection, local history, dashboards and configured rules continue without an internet connection. Exports to another platform resume when the connection returns, within the limits of each integration’s buffering.

Do I need an electrician?

Do I need an electrician?

Yes. Fitting current sensors around live conductors and connecting the ZEM-65 voltage reference is work for a qualified electrician. Split-core sensors and Rogowski coils close around existing cables, so no conductor has to be disconnected.

What does a first site cost?

What does a first site cost?

A typical first site is one ZGW-20 Gateway and four ZEM-65 monitors. That hardware is €3,499, excluding VAT and delivery. Installation is quoted by your electrician.

Does monitoring make a meter suitable for billing?

Does monitoring make a meter suitable for billing?

Not on its own. Legal metrology, approvals and billing rules depend on the jurisdiction, the instrument and the commercial process, so select and approve billing meters separately from the monitoring system.

Commercial buildings and outdoor utility plant across an industrial estate.

Tell us about your site

Describe the building, the equipment and the decisions you want to improve, and an engineer will work out the measurements and the system with you.