Connects the site hardware over Zigbee and runs Edge locally: dashboards, history, alerts and exports.
1 per site
- Cellular, EU plug
Measure mains, circuits, equipment and existing meters across one site or a portfolio. Analyse and act locally in Edge, or connect the same data to the energy platform you already use.
Start at the main incomer, then add the circuits, equipment and existing meters that explain the load, without running a data cable to every point. Protection and power-quality analysis still need instruments chosen for those jobs.
See all hardware
| Measurement need | Connection path | Check first |
|---|---|---|
| New three-phase power and energy | ZEM-65 → Zigbee → Gateway and Edge | Current range and conductor size |
| Existing Modbus RTU equipment | RS-485 → ZMB interface → Zigbee → Edge | Register map, address and serial settings |
| Existing IP or BMS equipment | Modbus TCP, BACnet/IP or OPC UA → Edge | Point identity and write permission |
| Pulse-output meter | Meter pulse output → ZPC → Zigbee → Edge | Pulse weight and maximum rate |
| Wired M-Bus heat meter | One meter → ZHM-21 → Zigbee → Edge | Meter address and the records you need |
| Process or utility transmitter | 4-20 mA → ZIO, or 0-10 V → ZVO → Zigbee → Edge | Range, units and loop power |
Most projects start with the main incomer and the three largest loads on one site: one Gateway and four electricity monitors, each measuring one three-phase circuit. The same Gateway carries up to 250 devices as the site grows.
Hardware total €3,499
Excluding VAT, delivery and installation.
System Builder starts from energy monitoring with this kit in mind.
Plan the points, owners and acceptance checks with the first-site planning worksheet.
Connects the site hardware over Zigbee and runs Edge locally: dashboards, history, alerts and exports.
1 per site
Measures one three-phase circuit to Class 0.5S as a system, with its current sensors connected and calibrated before it ships.
4 mains and three loads
Field devices measure the site, the Gateway connects them, and Edge stores, analyses and acts on the data on site. Other platforms can take the same data, and the site keeps collecting without them.
Configure devices, compare data, build dashboards and run rules on site.
Explore EdgeEach connection is a flow on the Gateway that sends the readings a platform needs, in the shape it expects.
Compare circuits and equipment over time, investigate out-of-hours loads and check the effect of operational changes. The chart controls and sensor list stay together in one workspace.
Explore dashboards, data and automation
See the main incomer and individual equipment on the same timeline.
Change time ranges and show or hide sensors to isolate what matters.
Send an alert or run a rule when a reading crosses a limit.
From manufacturing to nationwide estates, these projects show how our customers and partners use EpiSensor to understand and improve energy performance.
All case studies
Circuit-level measurements helped CoolPlanet find boiler trips and out-of-hours loads, then target changes to plant operation.
A Cardiff pilot connected site measurements to the existing EnergyCAP platform, providing the basis for a 40-mail-centre rollout.
EpiSensor metering supplied the data for ETS and Spacewell Energy to monitor use and configure site-specific alerts across Woodie’s stores.
Each guide names the measurement points, the hardware, the Edge setup and the commissioning checks for one kind of site or equipment.
One ZGW-20 Gateway carries up to 250 devices and around 1,000 sensor feeds. Zigbee devices form a mesh, and each hop reaches roughly 50 m indoors or 300 m outdoors, so the device count and the spacing between devices decide the layout together. Larger sites add Gateways.
The ZEM-65 is Class 0.5S as a system: its current sensors are connected and calibrated to the meter before it ships, so the accuracy class describes the whole measurement rather than the meter alone.
Yes. Edge runs on the Gateway, so collection, local history, dashboards and configured rules continue without an internet connection. Exports to another platform resume when the connection returns, within the limits of each integration’s buffering.
Yes. Fitting current sensors around live conductors and connecting the ZEM-65 voltage reference is work for a qualified electrician. Split-core sensors and Rogowski coils close around existing cables, so no conductor has to be disconnected.
A typical first site is one ZGW-20 Gateway and four ZEM-65 monitors. That hardware is €3,499, excluding VAT and delivery. Installation is quoted by your electrician.
Not on its own. Legal metrology, approvals and billing rules depend on the jurisdiction, the instrument and the commercial process, so select and approve billing meters separately from the monitoring system.