EPISENSOR | ENERGY MONITORING PROJECT WORKSHEET Revision: 20 September 2026 Guide: https://episensor.com/knowledge-base/energy-monitoring-project-worksheet Download, edit in a text or word editor, and print for a site discussion. Duplicate a measurement-point record for each required point. Keep unknowns explicit. This file does not send your answers to EpiSensor. Keep credentials, passwords and access tokens out; name the responsible access owner instead. 1. THE DECISION Site / operational area: _________________________________________________ Question the measurements should answer: _________________________________ _________________________________________________________________________ Who will use the answer? _________________________________________________ What action could they take? _____________________________________________ 2. MEASUREMENT POINTS ILLUSTRATIVE COMPLETED ROW - not a customer result or equipment selection: Boundary: refrigeration feeder, separate from other building loads Measurement: electrical energy (kWh) and power (kW) Existing source: to be surveyed Interval / required accuracy: to be agreed from the overnight-load decision Owner: facilities team BLANK POINT RECORD - duplicate as needed Equipment / circuit and physical boundary: _______________________________ Measurement and unit: ____________________________________________________ Cumulative total, interval consumption or instantaneous value: ____________ Existing source / model / firmware / map revision (if known): _____________ Required interval and reason: ____________________________________________ Required accuracy and reason: ____________________________________________ Owner and survey questions: ______________________________________________ _________________________________________________________________________ Electrical suitability and installation require qualified personnel, applicable product instructions and a site assessment. This is not an installation procedure. Do not infer billing, settlement or compliance suitability from the availability of a digital reading. Do not assume a savings result from before-and-after readings alone. 3. DATA DESTINATION Use Edge locally / external platform / both / not yet decided: ____________ Receiving application and responsible owner: _____________________________ Interface and authentication owner (no credentials): ______________________ Example point identity, units and scaling: ________________________________ _________________________________________________________________________ Time zone / source timestamp / ingestion timestamp: _______________________ Missing, invalid and delayed-reading representation: ______________________ Approved network access and restrictions: _________________________________ _________________________________________________________________________ Check local readings, transport success and receiving-application acceptance separately. Verify the intended point, value, unit and timestamp end to end. 4. INTERRUPTION BEHAVIOUR Measurement source stops reporting Required behaviour: ______________________________________________________ Safe test and acceptance owner: __________________________________________ Upstream connection becomes unavailable Required behaviour: ______________________________________________________ Safe test and acceptance owner: __________________________________________ Service returns after interruption Required behaviour: ______________________________________________________ Safe test and acceptance owner: __________________________________________ Value is outside expected range Required behaviour: ______________________________________________________ Safe test and acceptance owner: __________________________________________ Historical recovery needed / delayed-data and duplicate rules: ____________ _________________________________________________________________________ Buffering and recovery must be qualified for the selected configuration. Monitoring acceptance does not authorize remote control. Any control needs a separate control and safety scope agreed with the asset owner. 5. FIRST-SITE ACCEPTANCE [ ] Verified point map, physical boundaries, units and scaling [ ] Comparison against an agreed measurement reference [ ] Correct readings and timestamps accepted by the intended application [ ] Safe missing-data and recovery tests agreed and evidenced [ ] Operational handover, configuration records and support owners named Acceptance owner and date: ________________________________________________ Reference / comparison method and evidence location: ______________________ _________________________________________________________________________ Open question / owner / due date: _________________________________________ _________________________________________________________________________ Evidence needed before expanding to another site: _________________________ _________________________________________________________________________ NEXT STEP Explore the measurement path: https://episensor.com/system-builder Discuss unresolved questions: https://episensor.com/contact Review what you share before submitting an enquiry. This worksheet is not sent or attached automatically, and it is not a quotation or agreed scope.