EPISENSOR | ENERGY MONITORING ACCEPTANCE RECORD Revision: 23 September 2026 Guide: https://episensor.com/knowledge-base/energy-monitoring-commissioning-checklist One record for each site. Attach the point schedule and the interface records (pulse, M-Bus, Modbus, analogue) for the points that use them. Keep credentials, passwords and access tokens out of this file. 1. SITE AND VERSIONS Site and address: ________________________________________________________ Gateway model and serial: ________________________________________________ Edge version and configuration export reference: _________________________ Receiving platform and version (if any): _________________________________ Point schedule revision: _________________________________________________ 2. POINT CHECKS (one line for each point, or attach a table) Point ID Circuit/asset Device/channel Unit Source value Displayed value Pass ________ _____________ ______________ ____ ____________ _______________ ____ ________ _____________ ______________ ____ ____________ _______________ ____ ________ _____________ ______________ ____ ____________ _______________ ____ Checked under a second operating state? (yes / no): _______________________ Phase pairing checked on three-phase meters? (yes / no): __________________ Sign convention (import positive / export positive): ______________________ 3. TIME AND QUALITY Clock source for the Gateway: ____________________________________________ Timestamp meaning (source time / arrival time): ___________________________ Interval label (start / end of interval): _________________________________ A stale point shows as stale, not zero? (yes / no): _______________________ 4. FAILURE TESTS Test Start time End time What the data showed One device off __________ _________ _______________________ Gateway restart __________ _________ _______________________ Upstream link down __________ _________ _______________________ Upstream link restored __________ _________ _______________________ 5. DELIVERY TO THE RECEIVER Records expected for the outage window: ___________________________________ Records received: ________________________________________________________ Duplicates: ______________ Gaps: ______________ Late records kept? ______ 6. CONTROL (only if in scope) Approved test and owner: _________________________________________________ Command sent / accepted / feedback / measured result: ______________________ 7. HANDOVER Owner for stale data and alarms: _________________________________________ Owner for mapping changes: _______________________________________________ Owner for updates and backups: ___________________________________________ 8. ACCEPTANCE Tests not done, with reasons: ____________________________________________ Accepted by: ____________________________ Date: _______________________ Open items and owners: ___________________________________________________ _________________________________________________________________________